Files
republic-os/legal/us/code/title-33/chapter-11/section-516.md
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

3.7 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 33 U.S.C. § 516 Apportionment of cost us united_states_code code_section 33 NAVIGATION AND NAVIGABLE WATERS 11 BRIDGES OVER NAVIGABLE WATERS 516 33 U.S.C. § 516 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc33@119-100.zip /us/usc/t33/s516 data/legal/raw/us/code/title-33/usc33.xml 79907ea008710dab343146523a816bb9664cc177beebf63bb4e74991dd8ac866 de3d130b31eae77f8c0fc593f61b7287899297718d678d500eea123559828523 d34abff5542a2064ddaa72d07e6451bcb54034318a1961781704092907e9a702 2026-07-04 official
legal
us-code

33 U.S.C. § 516 - Apportionment of cost

Text

At the time the Secretary shall authorize the bridge owner to proceed with the project, as provided in section 515 of this title, and after an opportunity to the bridge owner to be heard thereon, the Secretary shall determine and issue an order specifying the proportionate shares of the total cost of the project to be borne by the United States and by the bridge owner. Such apportionment shall be made on the following basis: The bridge owner shall bear such part of the cost as is attributable to the direct and special benefits which will accrue to the bridge owner as a result of the alteration, including the expectable savings in repair or maintenance costs; and that part of the cost attributable to the requirements of traffic by railroad or highway, or both, including any expenditure for increased carrying capacity of the bridge, and including such proportion of the actual capital cost of the old bridge or of such part of the old bridge as may be altered or changed or rebuilt, as the used service life of the whole or a part, as the case may be, bears to the total estimated service life of the whole or such part: Provided, That in the event the alteration or relocation of any bridge may be desirable for the reason that the bridge unreasonably obstructs navigation, but also for some other reason, the Secretary may require equitable contribution from any interested person, firm, association, corporation, municipality, county, or State desiring such alteration or relocation for such other reason, as a condition precedent to the making of an order for such alteration or relocation. The United States shall bear the balance of the cost, including that part attributable to the necessities of navigation: And provided further, That where the bridge owner proceeds with the alteration on a successive partial bid basis the Secretary is authorized to issue an order of apportionment of cost for the entire alteration based on the accepted bid for the first part of the alteration and an estimate of cost for the remainder of the work. The Secretary is authorized to revise the order of apportionment of cost, to the extent he deems reasonable and proper, to meet any changed conditions.

(June 21, 1940, ch. 409, § 6, 54 Stat. 499; July 16, 1952, ch. 889, § 2, 66 Stat. 733; Pub. L. 85640, § 1(c), Aug. 14, 1958, 72 Stat. 595.)

Notes

Editorial Notes

Amendments1958—Pub. L. 85640 permitted issuance of an order of apportionment of cost for entire alteration based on the accepted bid for first part of alteration and an estimate of cost for remainder of work where bridge owner proceeds with alteration on a successive partial bid basis. 1952—Act July 16, 1952, made railroads share equally with proprietors of highways in bearing cost of alterations necessary to remove obstacles to navigation.