Files
republic-os/legal/us/code/title-42/chapter-92/section-8341.md
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

5.8 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 42 U.S.C. § 8341 Existing electric powerplants us united_states_code code_section 42 THE PUBLIC HEALTH AND WELFARE 92 POWERPLANT AND INDUSTRIAL FUEL USE 8341 42 U.S.C. § 8341 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip /us/usc/t42/s8341 data/legal/raw/us/code/title-42/usc42.xml 74bb27399c016f97fc119ab6ce14ca4775f5fd782805732e75e540a17de45d19 644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e 58f355d686864c053eed1cb13227bb8e0434646c007c2f1aa82321889ab33496 2026-07-04 official
legal
us-code

42 U.S.C. § 8341 - Existing electric powerplants

Text

(a) Certification by powerplants of coal capability At any time, the owner or operator of an existing electric powerplant may certify to the Secretary, for purposes of subsection (b)—

(1) whether or not such powerplant has or previously had the technical capability to use coal or another alternate fuel as a primary energy source;

(2) whether or not such powerplant could have the technical capability to use coal or another alternate fuel as a primary energy source without having—

(A) substantial physical modification of the powerplant, or

(B) substantial reduction in the rated capacity of the powerplant; and

(3) whether or not it is financially feasible to use coal or another alternate fuel as a primary energy source in such a powerplant.

(b) Authority of Secretary to prohibit where coal or alternate fuel capability exists The Secretary may prohibit, in accordance with section 8343(a) or (b) of this title, the use of petroleum or natural gas, or both, as a primary energy source in any existing electric powerplant, if an affirmative certification under subsection (a)(1), (2), and (3) is in effect with respect to such powerplant and if, after examining the basis for the certification, the Secretary concurs with the certification.

(c) Authority of Secretary to prohibit excessive use in mixtures At any time, the owner or operator of an existing electric powerplant may certify to the Secretary for purposes of this subsection whether or not it is technically and financially feasible to use a mixture of petroleum or natural gas and coal or another alternate fuel as a primary energy source in that powerplant. If an affirmative certification under this subsection is in effect with respect to such powerplant and if, after examining the basis for the certification, the Secretary concurs with the certification, the Secretary may prohibit, in accordance with section 8343(a) of this title, the use of petroleum or natural gas, or both, in such powerplant in amounts in excess of the minimum amount necessary to maintain reliability of operation of the unit consistent with maintaining reasonable fuel efficiency of such mixture.

(d) Amendment of subsection (a) and (c) certifications The owner or operator of any such powerplant may at any time amend any certification under subsection (a) or (c) in order to take into account changes in relevant facts and circumstances; except that no such amendment to such a certification may be made after the date of any final prohibition under subsection (b) or (c) based on that certification.

(Pub. L. 95620, title III, § 301, as added Pub. L. 9735, title X, § 1021(a), Aug. 13, 1981, 95 Stat. 614.)

Notes

Editorial Notes

Prior ProvisionsA prior section 8341, Pub. L. 95620, title III, § 301, Nov. 9, 1978, 92 Stat. 3305, related to existing electric powerplants, prior to repeal by Pub. L. 9735, title X, § 1021(a), Aug. 13, 1981, 95 Stat. 614.

Statutory Notes and Related Subsidiaries

Effective DateSection effective Aug. 13, 1981, see section 1038 of Pub. L. 9735, set out as an Effective Date of 1981 Amendment note under section 6240 of this title.

Validity of Orders Under Former Provisions of This SectionPub. L. 9735, title X, § 1022, Aug. 13, 1981, 95 Stat. 616, provided that: “(a) The amendments made by section 1021 to section 301(b) and (c) of the Powerplant and Industrial Fuel Use Act of 1978 [subsecs. (b) and (c) of this section] shall not apply to any electric powerplant for which a final order was issued pursuant to section 301(b) or (c) of such Act before the date of the enactment of this Act [Aug. 13, 1981]. “(b) Any electric powerplant issued a proposed order under section 301(b) or (c) of such Act which is pending on the date of the enactment of this Act may elect not to have the amendments made by section 1021 to such section 301(b) or (c) apply with respect to that powerplant. Such an election shall be irrevocable and shall be made in such form and manner as the Secretary of Energy shall, within 45 days after the date of the enactment of this Act, prescribe. Such an election shall be made not later than 60 days after the date on which the Secretary of Energy prescribes the form and manner of making such election. “(c)(1) The amendments made by section 1021 shall not affect the validity of any final order issued under section 301(b) or (c) of the Powerplant and Industrial Fuel Use Act of 1978 before the date of the enactment of this Act. “(2) The validity of any proposed order issued under such section 301(b) or (c) shall not be affected in the case of powerplants covered by elections made under subsection (b). “(3) The authority of the Secretary of Energy to amend, repeal, rescind, modify, or enforce any order referred to in paragraph (1) or (2), or rules applicable thereto, shall remain in effect notwithstanding any such amendments.”