Files
republic-os/legal/us/code/title-47/chapter-5/section-319.md
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

9.6 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 47 U.S.C. § 319 Construction permits us united_states_code code_section 47 TELECOMMUNICATIONS 5 WIRE OR RADIO COMMUNICATION 319 47 U.S.C. § 319 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc47@119-100.zip /us/usc/t47/s319 data/legal/raw/us/code/title-47/usc47.xml f64696e066e49944eefc8b98ecb498d9cf1d6eacbc8a4ad50946d9637079a65e 7cfb2d22df305544d8fac4913876d34c6b712d99019bd01ec134ed44ef145534 caf348a3268fee6f1c88d9b5078caefc9c616eca79dc45d67a99cd3e47dba7d4 2026-07-04 official
legal
us-code

47 U.S.C. § 319 - Construction permits

Text

(a) Requirements No license shall be issued under the authority of this chapter for the operation of any station unless a permit for its construction has been granted by the Commission. The application for a construction permit shall set forth such facts as the Commission by regulation may prescribe as to the citizenship, character, and the financial, technical, and other ability of the applicant to construct and operate the station, the ownership and location of the proposed station and of the station or stations with which it is proposed to communicate, the frequencies desired to be used, the hours of the day or other periods of time during which it is proposed to operate the station, the purpose for which the station is to be used, the type of transmitting apparatus to be used, the power to be used, the date upon which the station is expected to be completed and in operation, and such other information as the Commission may require. Such application shall be signed by the applicant in any manner or form, including by electronic means, as the Commission may prescribe by regulation.

(b) Time limitation; forfeiture Such permit for construction shall show specifically the earliest and latest dates between which the actual operation of such station is expected to begin, and shall provide that said permit will be automatically forfeited if the station is not ready for operation within the time specified or within such further time as the Commission may allow, unless prevented by causes not under the control of the grantee.

(c) Licenses for operation Upon the completion of any station for the construction or continued construction of which a permit has been granted, and upon it being made to appear to the Commission that all the terms, conditions, and obligations set forth in the application and permit have been fully met, and that no cause or circumstance arising or first coming to the knowledge of the Commission since the granting of the permit would, in the judgment of the Commission, make the operation of such station against the public interest, the Commission shall issue a license to the lawful holder of said permit for the operation of said station. Said license shall conform generally to the terms of said permit. The provisions of section 309(a)(g) of this title shall not apply with respect to any station license the issuance of which is provided for and governed by the provisions of this subsection.

(d) Government, amateur, or mobile station; waiver A permit for construction shall not be required for Government stations, amateur stations, or mobile stations. A permit for construction shall not be required for public coast stations, privately owned fixed microwave stations, or stations licensed to common carriers, unless the Commission determines that the public interest, convenience, and necessity would be served by requiring such permits for any such stations. With respect to any broadcasting station, the Commission shall not have any authority to waive the requirement of a permit for construction, except that the Commission may by regulation determine that a permit shall not be required for minor changes in the facilities of authorized broadcast stations. With respect to any other station or class of stations, the Commission shall not waive the requirement for a construction permit unless the Commission determines that the public interest, convenience, and necessity would be served by such a waiver.

(June 19, 1934, ch. 652, title III, § 319, 48 Stat. 1089; July 16, 1952, ch. 879, § 13, 66 Stat. 718; Mar. 26, 1954, ch. 111, 68 Stat. 35; Pub. L. 86609, § 2, July 7, 1960, 74 Stat. 363; Pub. L. 86752, § 4(b), Sept. 13, 1960, 74 Stat. 892; Pub. L. 87444, § 4, Apr. 27, 1962, 76 Stat. 64; Pub. L. 97259, title I, §§ 118, 119, Sept. 13, 1982, 96 Stat. 1095, 1096; Pub. L. 102538, title II, § 204(c), Oct. 27, 1992, 106 Stat. 3543; Pub. L. 104104, title IV, § 403(m), Feb. 8, 1996, 110 Stat. 132.)

Notes

Editorial Notes

References in TextThis chapter, referred to in subsec. (a), was in the original “this Act”, meaning act June 19, 1934, ch. 652, 48 Stat. 1064, known as the Communications Act of 1934, which is classified principally to this chapter. For complete classification of this Act to the Code, see section 609 of this title and Tables.

Amendments1996—Subsec. (d). Pub. L. 104104 substituted “With respect to any broadcasting station, the Commission shall not have any authority to waive the requirement of a permit for construction, except that the Commission may by regulation determine that a permit shall not be required for minor changes in the facilities of authorized broadcast stations. With respect to any other station or class of stations, the Commission shall not waive the requirement for a construction permit unless the Commission determines that the public interest, convenience, and necessity would be served by such a waiver.” for “With respect to any broadcasting station, the Commission shall not have any authority to waive the requirement of a permit for construction. With respect to any other station or class of stations, the Commission shall not waive such requirement unless the Commission determines that the public interest, convenience, and necessity would be served by such a waiver.” 1992—Subsec. (a). Pub. L. 102538 inserted before period at end “in any manner or form, including by electronic means, as the Commission may prescribe by regulation”. 1982—Subsec. (a). Pub. L. 97259, § 118, struck out “the construction of which is begun or is continued after this chapter takes effect,” after “operation of any station”. Subsec. (d). Pub. L. 97259, § 119, substituted provision that a permit for construction shall not be required for public coast stations, privately owned fixed microwave stations, or stations licensed to common carriers, unless the Commission determines that the public interest, convenience, and necessity would be served by requiring such permits for any such stations, that with respect to any broadcasting station, the Commission shall not have any authority to waive the requirement of a permit for construction, and that with respect to any other station or class of stations, the Commission shall not waive such requirement unless the Commission determines that the public interest, convenience, and necessity would be served by such a waiver, for provision that with respect to stations or classes of stations other than Government stations, amateur stations, mobile stations, and broadcasting stations, the Commission could waive the requirement of a permit for construction if it found that the public interest, convenience, or necessity would be served thereby, that such waiver would apply only to stations whose construction was begun subsequent to the effective date of the waiver, and that if the Commission found that the public interest, convenience, and necessity would be served thereby, it could waive the requirement of a permit for construction of a station that was engaged solely in rebroadcasting television signals if such station had been constructed on or before July 7, 1960. 1962—Subsec. (a). Pub. L. 87444 struck out requirement that applications were to be signed under oath or affirmation. 1960—Subsec. (c). Pub. L. 86752 inserted references to section 309(d)(g). Subsec. (d). Pub. L. 86609 authorized the Commission to waive the requirement of a permit for construction of a station engaged solely in rebroadcasting television signals if such station was constructed on or before July 7, 1960. 1954—Subsec. (b). Act Mar. 26, 1954, struck out sentence providing that a construction permit should not be required for Government stations, amateur stations, or stations upon mobile vessels, railroad rolling stock, or aircraft, such provisions being covered by subsec. (d) of this section. Subsec. (d). Act Mar. 26, 1954, added subsec. (d). 1952—Subsec. (a). Act July 16, 1952, § 13(a), (b), struck out “upon written application therefor” after “by the Commission” in first sentence, struck out second sentence, and substituted in third sentence, “The application for a construction permit shall set forth” for “This application shall set forth”. Subsec. (b). Act July 16, 1952, § 13(c), (d), struck out second sentence relating to assignment of rights under a permit, and struck out last two sentences, which are incorporated in subsec. (c). Subsec. (c). Act July 16, 1952, § 13(d), added subsec. (c).

Statutory Notes and Related Subsidiaries

Effective Date of 1960 AmendmentAmendment by Pub. L. 86752 effective ninety days after Sept. 13, 1960, see section 4(d)(1) of Pub. L. 86752, set out as a note under section 309 of this title.