Files
Fabio 00a184bb3c Legal corpus: U.S. Code titles 1–11 from pinned OLRC XML (11,050 sections)
Raw OLRC USLM XML zips @ release 119-100 (retrieved 2026-07-04 via
Atlas depot), ingested with the standard pipeline: raw snapshot ->
per-section OKF markdown -> manifest + checksums. Title 52 untouched.
LegalText: 171 -> 11,221. Titles 12-54 await a clean OLRC retry.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 09:52:37 -04:00

3.0 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 2 U.S.C. § 1816 Construction contracts us united_states_code code_section 2 THE CONGRESS 28 ARCHITECT OF THE CAPITOL 1816 2 U.S.C. § 1816 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc02@119-100.zip /us/usc/t2/s1816 data/legal/raw/us/code/title-02/usc02.xml 24a243e666c10dc1e41e19db7f5e11ceab49f921c2c2f2060467c0565d055e6d ec6910a011de0a97d11b263bbcd649766188311e429ae6bdb5fc2cf5e6ebbb9e 6cded0c03a56fb1931e80c98a07355aff0e8c94a6f6aa64f8b3362dc0dad7d32 2026-07-04 official
legal
us-code

2 U.S.C. § 1816 - Construction contracts

Text

(a) Liquidated damages The Architect of the Capitol may not enter into or administer any construction contract with a value greater than $50,000 unless the contract includes a provision requiring the payment of liquidated damages in the amount determined under subsection (b) in the event that completion of the project is delayed because of the contractor.

(b) Amount of payment The amount of payment required under a liquidated damages provision described in subsection (a) shall be equal to the product of—

(1) the daily liquidated damage payment rate; and

(2) the number of days by which the completion of the project is delayed.

(c) Daily liquidated damage payment rate (1) In general In subsection (b), the “daily liquidated damage payment rate” means—

(A) $140, in the case of a contract with a value greater than $50,000 and less than $100,000;

(B) $200, in the case of a contract with a value equal to or greater than $100,000 and equal to or less than $500,000; and

(C) the sum of $200 plus $50 for each $100,000 increment by which the value of the contract exceeds $500,000, in the case of a contract with a value greater than $500,000.

(2) Adjustment in rate permitted Notwithstanding paragraph (1), the daily liquidated damage payment rate may be adjusted by the contracting officer involved to a rate greater or lesser than the rate described in such paragraph if the contracting officer makes a written determination that the rate described does not accurately reflect the anticipated damages which will be suffered by the United States as a result of the delay in the completion of the contract.

(d) Effective date This section shall apply with respect to contracts entered into during fiscal year 2002 or any succeeding fiscal year.

(Pub. L. 10768, title I, § 130, Nov. 12, 2001, 115 Stat. 580.)

Notes

Editorial Notes

Codification Section was classified to section 166j of former Title 40, prior to the enactment of Title 40, Public Buildings, Property, and Works, by Pub. L. 107217, § 1, Aug. 21, 2002, 116 Stat. 1062.