Files
Fabio 00a184bb3c Legal corpus: U.S. Code titles 1–11 from pinned OLRC XML (11,050 sections)
Raw OLRC USLM XML zips @ release 119-100 (retrieved 2026-07-04 via
Atlas depot), ingested with the standard pipeline: raw snapshot ->
per-section OKF markdown -> manifest + checksums. Title 52 untouched.
LegalText: 171 -> 11,221. Titles 12-54 await a clean OLRC retry.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 09:52:37 -04:00

3.2 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 2 U.S.C. § 2162a Promoting maximum efficiency in operation of Capitol Power Plant us united_states_code code_section 2 THE CONGRESS 30 OPERATION AND MAINTENANCE OF CAPITOL COMPLEX 2162a 2 U.S.C. § 2162a current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc02@119-100.zip /us/usc/t2/s2162a data/legal/raw/us/code/title-02/usc02.xml 7f50fbb6ba66b34519f83c286fd0e856829cb3bb44861c162ec75b37c10e24c7 ec6910a011de0a97d11b263bbcd649766188311e429ae6bdb5fc2cf5e6ebbb9e efb9f3ad9f6c83239d98d1d5bcc6b0f8271fdb820931b100fa696542eb2edb03 2026-07-04 official
legal
us-code

2 U.S.C. § 2162a - Promoting maximum efficiency in operation of Capitol Power Plant

Text

(a) Steam boilers (1) In general The Architect of the Capitol shall take such steps as may be necessary to operate the steam boilers at the Capitol Power Plant in the most energy efficient manner possible to minimize carbon emissions and operating costs, including adjusting steam pressures and adjusting the operation of the boilers to take into account variations in demand, including seasonality, for the use of the system.

(2) Effective date The Architect shall implement the steps required under paragraph (1) not later than 30 days after December 19, 2007.

(b) Chiller plant (1) In general The Architect of the Capitol shall take such steps as may be necessary to operate the chiller plant at the Capitol Power Plant in the most energy efficient manner possible to minimize carbon emissions and operating costs, including adjusting water temperatures and adjusting the operation of the chillers to take into account variations in demand, including seasonality, for the use of the system.

(2) Effective date The Architect shall implement the steps required under paragraph (1) not later than 30 days after December 19, 2007.

(c) Meters Not later than 90 days after December 19, 2007, the Architect of the Capitol shall evaluate the accuracy of the meters in use at the Capitol Power Plant and correct them as necessary.

(d) Report on implementation Not later than 180 days after December 19, 2007, the Architect of the Capitol shall complete the implementation of the requirements of this section and submit a report describing the actions taken and the energy efficiencies achieved to the Committee on Transportation and Infrastructure of the House of Representatives, the Committee on Commerce, Science, and Transportation of the Senate, the Committee on House Administration of the House of Representatives, and the Committee on Rules and Administration of the Senate.

(Pub. L. 110140, title V, § 504, Dec. 19, 2007, 121 Stat. 1656.)

Notes

Statutory Notes and Related Subsidiaries

Effective DateSection effective on the date that is 1 day after Dec. 19, 2007, see section 1601 of Pub. L. 110140, set out as a note under section 1824 of this title.