Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

3.0 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 14 U.S.C. § 1131 Identification of major system acquisitions us united_states_code code_section 14 COAST GUARD 11 ACQUISITIONS 1131 14 U.S.C. § 1131 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc14@119-100.zip /us/usc/t14/s1131 data/legal/raw/us/code/title-14/usc14.xml e06b4c3171bf4f00e68dd7881ae006d50f25db4d3714f36d04ccfa583ace2983 0a287809467d795ac0e1a72d6743ea6b1d340c0f74c77c67bfeba10724006304 dc93349ff261e1f9160af012688b68c5a476e64c4df9e2dc4212cf21426ba469 2026-07-04 official
legal
us-code

14 U.S.C. § 1131 - Identification of major system acquisitions

Text

(a) In General.— (1) Support mechanisms.— The Commandant shall develop and implement mechanisms to support the establishment of mature and stable operational requirements for all acquisitions.

(2) Mission analysis; affordability assessment.— The Commandant may not initiate a Level 1 or Level 2 acquisition project or program until the Commandant—

(A) completes a mission analysis that—

(i) identifies the specific capability gaps to be addressed by the project or program; and

(ii) develops a clear mission need to be addressed by the project or program; and

(B) prepares a preliminary affordability assessment for the project or program.

(b) Elements.— (1) Requirements.— The mechanisms required by subsection (a) shall ensure the implementation of a formal process for the development of a mission-needs statement, concept-of-operations document, capability development plan, and resource proposal for the initial project or program funding, and shall ensure the project or program is included in the Coast Guard Capital Investment Plan.

(2) Assessment of trade-offs.— In conducting an affordability assessment under subsection (a)(2)(B), the Commandant shall develop and implement mechanisms to ensure that trade-offs among cost, schedule, and performance are considered in the establishment of preliminary operational requirements for development and production of new assets and capabilities for Level 1 and Level 2 acquisitions projects and programs.

(c) Human Resource Capital Planning.— The Commandant shall develop staffing predictions, define human capital performance initiatives, and identify preliminary training needs required to implement each Level 1 and Level 2 acquisition project and program.

(Added Pub. L. 111281, title IV, § 402(a), Oct. 15, 2010, 124 Stat. 2941, § 571; renumbered § 1131, Pub. L. 115282, title I, § 108(b), Dec. 4, 2018, 132 Stat. 4208.)

Notes

Editorial Notes

Amendments2018—Pub. L. 115282 renumbered section 571 of this title as this section.