Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2.1 KiB
type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
| type | title | description | jurisdiction | corpus | kind | title_number | title_name | chapter_number | chapter_name | section | citation | status | release_point | release_date | source | source_url | source_identifier | source_file | source_hash | raw_snapshot_hash | text_hash | retrieved_at | confidence | tags | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LegalText | 16 U.S.C. § 797c | Dams in National Park System units | us | united_states_code | code_section | 16 | CONSERVATION | 12 | FEDERAL REGULATION AND DEVELOPMENT OF POWER | 797c | 16 U.S.C. § 797c | current | 119-100 | 2026-06-26 | official | https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip | /us/usc/t16/s797c | data/legal/raw/us/code/title-16/usc16.xml | 772c67552a10d4da7a24e6c0b1fe5d763506a9f36506356648648edd8f922a79 | 7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503 | 6bea1ef0d45db5af09c4e2b9cf62624a0a40b5200141c485c4a2bacb7b296549 | 2026-07-04 | official |
|
16 U.S.C. § 797c - Dams in National Park System units
Text
After October 24, 1992, the Federal Energy Regulatory Commission may not issue an original license under Part I of the Federal Power Act [16 U.S.C. 791a et seq.] (nor an exemption from such Part) for any new hydroelectric power project located within the boundaries of any unit of the National Park System that would have a direct adverse effect on Federal lands within any such unit. Nothing in this section shall be construed as repealing any existing provision of law (or affecting any treaty) explicitly authorizing a hydroelectric power project.
(Pub. L. 102–486, title XXIV, § 2402, Oct. 24, 1992, 106 Stat. 3097.)
Notes
Editorial Notes
References in TextThe Federal Power Act, referred to in text, is act June 10, 1920, ch. 285, 41 Stat. 1063. Part I of the Act is classified generally to this subchapter (§ 791a et seq.). For complete classification of this Act to the Code, see section 791a of this title and Tables.
Codification Section was enacted as part of the Energy Policy Act of 1992, and not as part of the Federal Power Act which generally comprises this chapter.