Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

5.3 KiB

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 16 U.S.C. § 832c Distribution of electricity; preference to public bodies and cooperatives us united_states_code code_section 16 CONSERVATION 12B BONNEVILLE PROJECT 832c 16 U.S.C. § 832c current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip /us/usc/t16/s832c data/legal/raw/us/code/title-16/usc16.xml c6d7c45cceed2d183519e06312e6331c6bf9cd96599cbd012df1cc699d90e91b 7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503 23fb707ebef05ef380dc43cdeed6558fb0414c41b2ccec74fc5db72ccfdbb2d4 2026-07-04 official
legal
us-code

16 U.S.C. § 832c - Distribution of electricity; preference to public bodies and cooperatives

Text

(a) General provisions In order to insure that the facilities for the generation of electric energy at the Bonneville project shall be operated for the benefit of the general public, and particularly of domestic and rural consumers, the administrator shall at all times, in disposing of electric energy generated at said project, give preference and priority to public bodies and cooperatives.

(b) Prior to January 1, 1942; subsequent thereto To preserve and protect the preferential rights and priorities of public bodies and cooperatives as provided in section 11 So in original. Probably should be “subsection”. (a) and to effectuate the intent and purpose of this chapter that at all times up to January 1, 1942, there shall be available for sale to public bodies and cooperatives not less than 50 per centum of the electric energy produced at the Bonneville project, it shall be the duty of the administrator in making contracts for the sale of such energy to so arrange such contracts as to make such 50 per centum of such energy available to said public bodies and cooperatives until January 1, 1942: Provided, That the electric energy so reserved for but not actually purchased by and delivered to such public bodies and cooperatives prior to January 1, 1942, may be disposed of temporarily so long as such temporary disposition will not interfere with the purchase by and delivery to such public bodies and cooperatives at any time prior to January 1, 1942: Provided further, That nothing herein contained shall be construed to limit or impair the preferential and priority rights of such public bodies or cooperatives after January 1, 1942; and in the event that after such date there shall be conflicting or competing applications for an allocation of electric energy between any public body or cooperative on the one hand and a private agency of any character on the other, the application of such public body or cooperative shall be granted.

(c) Allowance of time for financing An application by any public body or cooperative for an allocation of electric energy shall not be denied, or another application competing or in conflict therewith be granted, to any private corporation, company, agency, or person, on the ground that any proposed bond or other security issue of any such public body or cooperative, the sale of which is necessary to enable such prospective purchaser to enter into the public business of selling and distributing the electric energy proposed to be purchased, has not been authorized or marketed, until after a reasonable time, to be determined by the administrator, has been afforded such public body or cooperative to have such bond or other security issue authorized or marketed.

(d) Congressional declaration of policy; allowance of time for creation and organization It is declared to be the policy of the Congress, as expressed in this chapter, to preserve the said preferential status of the public bodies and cooperatives herein referred to, and to give to the people of the States within economic transmission distance of the Bonneville project reasonable opportunity and time to hold any election or elections or take any action necessary to create such public bodies and cooperatives as the laws of such States authorize and permit, and to afford such public bodies or cooperatives reasonable time and opportunity to take any action necessary to authorize the issuance of bonds or to arrange other financing necessary to construct or acquire necessary and desirable electric distribution facilities, and in all other respects legally to become qualified purchasers and distributors of electric energy available under this chapter.

(Aug. 20, 1937, ch. 720, § 4, 50 Stat. 733; Mar. 6, 1940, ch. 47, § 3, 54 Stat. 47.)

Notes

Editorial Notes

Amendments1940—Subsec. (b). Act Mar. 6, 1940, substituted “January 1, 1942” for “January 1, 1941” wherever appearing.

Statutory Notes and Related Subsidiaries

Transfer of Functions Functions of Secretary of the Interior with respect to Bonneville Power Administration transferred to Secretary of Energy by section 7152(a)(1)(D), (2) of Title 42, The Public Health and Welfare, with Bonneville Power Administration to be preserved as a distinct organizational entity within Department of Energy and headed by an Administrator.