Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

3.7 KiB

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 16 U.S.C. § 833 Completion and maintenance of project; generation of electricity us united_states_code code_section 16 CONSERVATION 12C FORT PECK PROJECT 833 16 U.S.C. § 833 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip /us/usc/t16/s833 data/legal/raw/us/code/title-16/usc16.xml 0a88b6d861f2c74ad32acc1fbcda89b623308be084ea018f03ad11fce6342c52 7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503 8d7666db4557393adebd7bc99600462c7a3289e13b9166528d92a3c3e04996a1 2026-07-04 official
legal
us-code

16 U.S.C. § 833 - Completion and maintenance of project; generation of electricity

Text

For the purpose of improving navigation on the Missouri River, and for other purposes incidental thereto, the dam and appurtenant works now under construction at Fort Peck, Montana, and a suitable power plant for the production of hydroelectric power (which dam, power plant, and appurtenant works are hereinafter called Fort Peck project), shall be completed, maintained, and operated under the direction of the Secretary of the Army and the supervision of the Chief of Engineers, subject to the provisions of this chapter relating to the powers and duties of the Bureau of Reclamation (hereinafter called the Bureau), as provided for in section 833a(a) of this title, respecting the transmission and sale of electric energy generated at said project. The Secretary of the Army shall provide, construct, operate, maintain, and improve at Fort Peck project such machinery, equipment, and facilities for the generation of electric energy as the Bureau may deem necessary to develop such electric energy as rapidly as markets may be found therefor. The electric energy thus generated and not required for the operation of the dam at such project and the navigation facilities employed in connection therewith shall be delivered to the Bureau for disposition as provided in this chapter.

(May 18, 1938, ch. 250, § 1, 52 Stat. 403; July 26, 1947, ch. 343, title II, § 205(a), 61 Stat. 501.)

Notes

Statutory Notes and Related Subsidiaries

Change of Name Department of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II, 61 Stat. 501. Section 205(a) of act July 26, 1947, was repealed by section 53 of act Aug. 10, 1956, ch. 1041, 70A Stat. 641. Section 1 of act Aug. 10, 1956, enacted “Title 10, Armed Forces” which in sections 3010 to 3013 continued military Department of the Army under administrative supervision of Secretary of the Army.

Transfer of Functions Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by section 7152(a)(1)(E), (3) of Title 42, The Public Health and Welfare, and are to be exercised by Secretary through a separate Administration within Department of Energy.

Executive Documents

Transfer of Functions For transfer of functions of other officers, employees, and agencies of Department of the Interior, with certain exceptions, to Secretary of the Interior, with power to delegate, see Reorg. Plan No. 3 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3174, 64 Stat. 1262, set out in the Appendix to Title 5, Government Organization and Employees.