Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

8.9 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 42 U.S.C. § 16215 Electric transmission and distribution programs us united_states_code code_section 42 THE PUBLIC HEALTH AND WELFARE 149 NATIONAL ENERGY POLICY AND PROGRAMS 16215 42 U.S.C. § 16215 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip /us/usc/t42/s16215 data/legal/raw/us/code/title-42/usc42.xml 864bada462fbae7b2cefa6b0b0f94103b498b0d3cf6b2a05b63a02adfedc7a73 644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e cac97b2e94ee61b99905bb2e6c16034aae33576b321cdcb95dbec2a846eb12cc 2026-07-04 official
legal
us-code

42 U.S.C. § 16215 - Electric transmission and distribution programs

Text

(a) Program The Secretary shall establish a comprehensive research, development, and demonstration program to ensure the reliability, efficiency, and environmental integrity of electrical transmission and distribution systems, which shall include—

(1) advanced energy delivery technologies, energy storage technologies, materials, and systems, giving priority to new transmission technologies, including composite conductor materials and other technologies that enhance reliability, operational flexibility, or power-carrying capability;

(2) advanced grid reliability and efficiency technology development;

(3) technologies contributing to significant load reductions;

(4) advanced metering, load management, and control technologies;

(5) technologies to enhance existing grid components;

(6) the development and use of high-temperature superconductors to—

(A) enhance the reliability, operational flexibility, or power-carrying capability of electric transmission or distribution systems; or

(B) increase the efficiency of electric energy generation, transmission, distribution, or storage systems;

(7) integration of power systems, including systems to deliver high-quality electric power, electric power reliability, and combined heat and power;

(8) supply of electricity to the power grid by small scale, distributed and residential-based power generators;

(9) the development and use of advanced grid design, operation, and planning tools;

(10) the development of cost-effective technologies that enable two-way information and power flow between distributed energy resources and the electric grid;

(11) the development of technologies and concepts that enable interoperability between distributed energy resources and other behind-the-meter devices and the electric grid;

(12) any other infrastructure technologies, as appropriate; and

(13) technology transfer and education.

(b) Program plan (1) In general Not later than 1 year after August 8, 2005, the Secretary, in consultation with other appropriate Federal agencies, shall prepare and submit to Congress a 5-year program plan to guide activities under this section.

(2) Consultation In preparing the program plan, the Secretary shall consult with—

(A) utilities;

(B) energy service providers;

(C) manufacturers;

(D) institutions of higher education;

(E) other appropriate State and local agencies;

(F) environmental organizations;

(G) professional and technical societies; and

(H) any other persons the Secretary considers appropriate.

(c) Implementation The Secretary shall consider implementing the program under this section using a consortium of participants from industry, institutions of higher education, and National Laboratories.

(d) Report Not later than 2 years after the submission of the plan under subsection (b), the Secretary shall submit to Congress a report—

(1) describing the progress made under this section; and

(2) identifying any additional resources needed to continue the development and commercial application of transmission and distribution of infrastructure technologies.

(e) Power delivery research initiative (1) In general The Secretary shall establish a research, development, and demonstration initiative specifically focused on power delivery using components incorporating high temperature superconductivity.

(2) Goals The goals of the Initiative shall be—

(A) to establish world-class facilities to develop high temperature superconductivity power applications in partnership with manufacturers and utilities;

(B) to provide technical leadership for establishing reliability for high temperature superconductivity power applications, including suitable modeling and analysis;

(C) to facilitate the commercial transition toward direct current power transmission, storage, and use for high power systems using high temperature superconductivity; and

(D) to facilitate the integration of very low impedance high temperature superconducting wires and cables in existing electric networks to improve system performance, power flow control, and reliability.

(3) Inclusions The Initiative shall include—

(A) feasibility analysis, planning, research, and design to construct demonstrations of superconducting links in high power, direct current, and controllable alternating current transmission systems;

(B) public-private partnerships to demonstrate deployment of high temperature superconducting cable into testbeds simulating a realistic transmission grid and under varying transmission conditions, including actual grid insertions; and

(C) testbeds developed in cooperation with National Laboratories, industries, and institutions of higher education to—

(i) demonstrate those technologies;

(ii) prepare the technologies for commercial introduction; and

(iii) address cost or performance roadblocks to successful commercial use.

(f) Transmission and distribution grid planning and operations initiative (1) In general The Secretary shall establish a research, development, and demonstration initiative specifically focused on tools needed to plan, operate, and expand the transmission and distribution grids in the presence of competitive market mechanisms for energy, load demand, customer response, and ancillary services.

(2) Goals The goals of the Initiative shall be—

(A) (i) to develop and use a geographically distributed center, consisting of institutions of higher education, and National Laboratories, with expertise and facilities to develop the underlying theory and software for power system application; and

(ii) to ensure commercial development in partnership with software vendors and utilities;

(B) to provide technical leadership in engineering and economic analysis for the reliability and efficiency of power systems planning and operations in the presence of competitive markets for electricity;

(C) to model, simulate, and experiment with new market mechanisms and operating practices to understand and optimize those new methods before actual use; and

(D) to provide technical support and technology transfer to electric utilities and other participants in the domestic electric industry and marketplace.

(g) High-voltage transmission lines As part of the program described in subsection (a), the Secretary shall award a grant to a university research program to design and test, in consultation with the Tennessee Valley Authority, state-of-the-art optimization techniques for power flow through existing high voltage transmission lines.

(Pub. L. 10958, title IX, § 925, Aug. 8, 2005, 119 Stat. 865; Pub. L. 116260, div. Z, title VIII, § 8004(a), Dec. 27, 2020, 134 Stat. 2583.)

Notes

Editorial Notes

Amendments2020—Subsec. (a)(10) to (13). Pub. L. 116260 added pars. (10) and (11) and redesignated former pars. (10) and (11) as (12) and (13), respectively.

Statutory Notes and Related Subsidiaries

Coordination of EffortsPub. L. 116260, div. Z, title VIII, § 8006, Dec. 27, 2020, 134 Stat. 2586, provided that: “In carrying out the amendments made by this title [enacting sections 16236, 17014, 17384a, 17387, and 17388 of this title and amending this section, section 17384 of this title and sections 3501 and 3502 of Title 25, Indians], the Secretary [probably means Secretary of Energy] shall coordinate with relevant entities to the maximum extent practicable, including— “(1) electric utilities; “(2) private sector entities; “(3) representatives of all sectors of the electric power industry; “(4) transmission organizations; “(5) transmission owners and operators; “(6) distribution organizations; “(7) distribution asset owners and operators; “(8) State, Tribal, local, and territorial governments and regulatory authorities; “(9) academic institutions; “(10) the National Laboratories; “(11) other Federal agencies; “(12) nonprofit organizations; “(13) the Federal Energy Regulatory Commission; “(14) the North American Reliability Corporation; “(15) independent system operators; and “(16) programs and program offices at the Department.”