Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.0 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 42 U.S.C. § 18715b Interregional and offshore wind electricity transmission planning, modeling, and analysis us united_states_code code_section 42 THE PUBLIC HEALTH AND WELFARE 162 ENERGY INFRASTRUCTURE 18715b 42 U.S.C. § 18715b current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip /us/usc/t42/s18715b data/legal/raw/us/code/title-42/usc42.xml 9a9136edbacaccca1dc7d08d7ae0054e43e8700396fedcd523b379769c8163a5 644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e e6dc6943291983b5b9673ff279cb42fed7c7ba58c5ae37281fb12a34fb7cc7b6 2026-07-04 official
legal
us-code

42 U.S.C. § 18715b - Interregional and offshore wind electricity transmission planning, modeling, and analysis

Text

(a) Appropriation In addition to amounts otherwise available, there is appropriated to the Secretary for fiscal year 2022, out of any money in the Treasury not otherwise appropriated, $100,000,000, to remain available through September 30, 2031, to carry out this section.

(b) Use of funds The Secretary shall use amounts made available under subsection (a)—

(1) to pay expenses associated with convening relevant stakeholders to address the development of interregional electricity transmission and transmission of electricity that is generated by offshore wind; and

(2) to conduct planning, modeling, and analysis regarding interregional electricity transmission and transmission of electricity that is generated by offshore wind, taking into account the local, regional, and national economic, reliability, resilience, security, public policy, and environmental benefits of interregional electricity transmission and transmission of electricity that is generated by offshore wind, including planning, modeling, and analysis, as the Secretary determines appropriate, pertaining to—

(A) clean energy integration into the electric grid, including the identification of renewable energy zones;

(B) the effects of changes in weather due to climate change on the reliability and resilience of the electric grid;

(C) cost allocation methodologies that facilitate the expansion of the bulk power system;

(D) the benefits of coordination between generator interconnection processes and transmission planning processes;

(E) the effect of increased electrification on the electric grid;

(F) power flow modeling;

(G) the benefits of increased interconnections or interties between or among the Western Interconnection, the Eastern Interconnection, the Electric Reliability Council of Texas, and other interconnections, as applicable;

(H) the cooptimization of transmission and generation, including variable energy resources, energy storage, and demand-side management;

(I) the opportunities for use of nontransmission alternatives, energy storage, and grid-enhancing technologies;

(J) economic development opportunities for communities arising from development of interregional electricity transmission and transmission of electricity that is generated by offshore wind;

(K) evaluation of existing rights-of-way and the need for additional transmission corridors; and

(L) a planned national transmission grid, which would include a networked transmission system to optimize the existing grid for interconnection of offshore wind farms.

(Pub. L. 117169, title V, § 50153, Aug. 16, 2022, 136 Stat. 2048.)

Notes

Editorial Notes

Codification Section was enacted as part of Pub. L. 117169, and not as part of div. D of Pub. L. 11758, which enacted this chapter.

Statutory Notes and Related Subsidiaries

Definition of “Secretary” “Secretary” means the Secretary of Energy, see section 50111 of Pub. L. 117169, set out as a note under section 17113b of this title.