Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.0 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 42 U.S.C. § 2076 Guaranteed purchase prices us united_states_code code_section 42 THE PUBLIC HEALTH AND WELFARE 23 DEVELOPMENT AND CONTROL OF ATOMIC ENERGY 2076 42 U.S.C. § 2076 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip /us/usc/t42/s2076 data/legal/raw/us/code/title-42/usc42.xml 79acac3beb37159fd825d7e90a1ef0d7445c403099f5067624633e90bc254d3c 644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e c5d0c7a3fffdb668133cbe07c55ba04a039d69333b1fc0dd38a4846995f670d7 2026-07-04 official
legal
us-code

42 U.S.C. § 2076 - Guaranteed purchase prices

Text

The Commission shall establish guaranteed purchase prices for plutonium produced in a nuclear reactor by a person licensed under section 2134 of this title and delivered to the Commission before January 1, 1971. The Commission shall also establish for such periods of time as it may deem necessary, but not to exceed ten years as to any such period, guaranteed purchase prices for uranium enriched in the isotope 233 produced in a nuclear reactor by a person licensed under section 2133 or section 2134 and delivered to the Commission within the period of the guarantee. Guaranteed purchase prices established under the authority of this section shall not exceed the Commissions determination of the estimated value of plutonium or uranium enriched in the isotope 233 as fuel in nuclear reactors, and such prices shall be established on a nondiscriminatory basis: Provided, That the Commission is authorized to establish such guaranteed purchase prices only for such plutonium or uranium enriched in the isotope 233 as the Commission shall determine is produced through the use of special nuclear material which was leased or sold by the Commission pursuant to section 2073 of this title.

(Aug. 1, 1946, ch. 724, title I, § 56, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 931; amended Pub. L. 88489, § 11, Aug. 26, 1964, 78 Stat. 605; Pub. L. 91560, § 2, Dec. 19, 1970, 84 Stat. 1472; renumbered title I, Pub. L. 102486, title IX, § 902(a)(8), Oct. 24, 1992, 106 Stat. 2944.)

Notes

Editorial Notes

Amendments1970—Pub. L. 91560 extended the power of the Commission to establish guaranteed purchase prices for uranium produced by persons licensed under section 2133 of this title. 1964—Pub. L. 88489 substituted provisions which directed the Commission to establish guaranteed purchase prices for plutonium produced by a person licensed under section 2134 of this title and delivered to the Commission prior to Jan. 1, 1971, and for uranium enriched in the isotope 233, for such periods of time as it deems necessary, but not exceeding ten years as to any such period, if produced by a person licensed under said section 2134, and delivered within the period of the guarantee, provided that guaranteed prices established under this section shall not exceed the Commissions estimated value of enriched plutonium or uranium as fuel in reactors, and shall be on a nondiscriminatory basis, and authorized such guaranteed prices only for such enriched plutonium or uranium as is produced through use of material leased or sold pursuant to section 2073 of this title, for provisions requiring the Commission to determine the fair price of special nuclear material by considering the value of the material for its intended use by the United States, and by giving such weight to the cost of production as it found to be equitable, providing that such price was to apply to all licensed producers of the same material, and permitting the Commission to establish guaranteed fair prices for all such material delivered to the Commission for such time as it deemed necessary, but not exceeding seven years.