Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

3.9 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 390g2 Phase II of groundwater recharge demonstration program us united_states_code code_section 43 PUBLIC LANDS 12 RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT 390g2 43 U.S.C. § 390g2 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s390g2 data/legal/raw/us/code/title-43/usc43.xml d5de6ed3c638cd7512df7cbecb20bacc8166361757fbddb689754b63637ab108 d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f 1403d39ee86dc6af6cd9f7aa58599aed96f4ced4173f796878beb715d25524d2 2026-07-04 official
legal
us-code

43 U.S.C. § 390g2 - Phase II of groundwater recharge demonstration program

Text

(a) Design, construction, and operation of projects During phase II, and subject to State water laws and interstate water compacts, the Bureau is authorized and directed to design, construct, and operate demonstration projects in the High Plains States and other Reclamation Act States to recharge groundwater systems as recommended in the report referred to in subsection (c).

(b) Alternative means of cost allocation; economic feasibility of projects During phase II the Secretary, acting through the Bureau, shall contract with the various High Plains States and other Reclamation Act States to conduct a study to identify and evaluate alternative means by which the costs of groundwater recharge projects could be allocated among the beneficiaries of the projects within the respective States and identify and evaluate the economic feasibility of and the legal authority for utilizing groundwater recharge in water resource development projects.

(c) Reports to Congress (1) Within twelve months after the initiation of phase II, and at annual intervals thereafter, the Secretary shall submit interim reports to Congress. Each report shall contain a detailed statement of his findings and progress respecting the design, construction, and operation of the demonstration projects referred to in subsection (a) and the study referred to in subsection (b).

(2) Within five years after the initiation of phase II, the Secretary shall submit a summary report to Congress. The summary report shall contain—

(A) a detailed evaluation of the demonstration projects referred to in subsection (a);

(B) the results of the studies referred to in subsection (b);

(C) specific recommendations regarding the location, scope, and feasibility of operational groundwater recharge projects to be constructed and maintained by the Bureau; and

(D) an evaluation of the feasibility of integrating these groundwater recharge projects into existing reclamation projects.

(3) In addition to recommendations made under section 390g1 of this title, the Secretary shall make additional recommendations for design, construction, and operation of demonstration projects. Such projects are authorized to be designed, constructed, and operated in accordance with subsection (a).

(4) Each project under this section shall terminate five years after the date on which construction on the project is completed.

(5) At the conclusion of phase II the Secretary shall submit a final report to the Congress which shall include, but not be limited to, a detailed evaluation of the projects under this section.

(Pub. L. 98434, § 4, Sept. 28, 1984, 98 Stat. 1676; Pub. L. 102575, title XXVI, § 2601(1), (2), Oct. 30, 1992, 106 Stat. 4689.)

Notes

Editorial Notes

Amendments1992—Subsec. (c). Pub. L. 102575 substituted “summary report” for “final report” in two places in introductory provisions of par. (2) and added pars. (3) to (5).