76b8ec33a7
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
1.7 KiB
1.7 KiB
type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
| type | title | description | jurisdiction | corpus | kind | title_number | title_name | chapter_number | chapter_name | section | citation | status | release_point | release_date | source | source_url | source_identifier | source_file | source_hash | raw_snapshot_hash | text_hash | retrieved_at | confidence | tags | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LegalText | 43 U.S.C. § 390h–12m | Mission Basin Brackish Groundwater Desalting Demonstration Project | us | united_states_code | code_section | 43 | PUBLIC LANDS | 12 | RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT | 390h–12m | 43 U.S.C. § 390h–12m | current | 119-100 | 2026-06-26 | official | https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip | /us/usc/t43/s390h–12m | data/legal/raw/us/code/title-43/usc43.xml | 784a5c836439ae1f4157e28a94667a9d198321b5030aeeee62941db8bd8c0636 | d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f | 8281bdc4501425d5f510d12e9d81af8de161073b2669147e41d54c327039f231 | 2026-07-04 | official |
|
43 U.S.C. § 390h–12m - Mission Basin Brackish Groundwater Desalting Demonstration Project
Text
(a) Authorization The Secretary, in cooperation with the City of Oceanside, is authorized to participate in the design, planning, and construction of a 3,000,000 gallon per day expansion of the Mission Basin Brackish Groundwater Desalting Demonstration Project in Oceanside, California.
(b) Cost share The Federal share of the cost of a project described in subsection (a) shall not exceed 25 percent of the total cost.
(c) Limitation The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a).
(Pub. L. 102–575, title XVI, § 1627, as added Pub. L. 104–266, § 2(a)(2), Oct. 9, 1996, 110 Stat. 3293.)