Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.2 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 390h5 San Jose area water reclamation and reuse program us united_states_code code_section 43 PUBLIC LANDS 12 RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT 390h5 43 U.S.C. § 390h5 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s390h5 data/legal/raw/us/code/title-43/usc43.xml 10fd84a06a1a3422ac2964061fb6b527c7c0b21a6f7685a6038ac5916edcd2bd d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f c88bed61651082e8f4d55bdc2393892ce445b2a07aef9e0b494f6d707585b51e 2026-07-04 official
legal
us-code

43 U.S.C. § 390h5 - San Jose area water reclamation and reuse program

Text

(a) The Secretary, in cooperation with the city of San Jose, California, and the Santa Clara Valley Water District, and local water suppliers, shall participate in the planning, design and construction of demonstration and permanent facilities to reclaim and reuse water in the San Jose metropolitan service area.

(b) The Federal share of the costs of the facilities authorized by subsection (a) shall not exceed 25 per centum of the total. The Secretary shall not provide funds for the operation or maintenance of the project.

(Pub. L. 102575, title XVI, § 1607, Oct. 30, 1992, 106 Stat. 4666.)

Notes

Statutory Notes and Related Subsidiaries

Demonstration of Waste Water Technology, Santa Clara Valley Water District and San Jose, CaliforniaPub. L. 102580, title II, § 218, Oct. 31, 1992, 106 Stat. 4834, provided that: “(a) In General.—The Secretary, in cooperation with the Administrator of the Environmental Protection Agency, is authorized to provide design and construction assistance to the Santa Clara Valley Water District in San Jose, California, and to the city of San Jose, California, for demonstrating and field testing public use innovative processes which advance the technology of waste water reuse and treatment and which promote the use of treated waste water for critical water supply purposes and for the protection of fish and wildlife in the San Francisco Bay. All design, construction, and comprehensive health effects studies shall be carried out by non-Federal interests. “(b) Purposes of Assistance.—Assistance may be provided under this section—“(1) for the design and construction of an innovative nonpotable waste water reuse treatment facility with distribution systems; “(2) for the design and construction of an innovative potable waste water reuse pilot plant; “(3) for implementation of a comprehensive health effects study of the performance of the potable waste water reuse pilot plant; and “(4) after the pilot plant is constructed and is operational, for the design and construction of a potable waste water reuse project, along with integration of the additional potable processes into the existing nonpotable facilities, and the extension of the distribution systems to groundwater recharge areas, if the Secretary, in cooperation with the Administrator of the Environmental Protection Agency, determines that the established public health requirements and water quality goals and objectives are being met by the pilot plant, the public health and safety is not at risk as a result of the operation of the pilot plant, and the pilot plant is operating reliably. “(c) Cost Sharing.—Total project costs under this section shall be shared at 75 percent Federal and 25 percent non-Federal. The non-Federal sponsor shall receive credit for lands, easements, rights-of-way, and relocations toward its share of project costs, but not to exceed 25 percent of total project costs. Operation and maintenance cost shall be 100 percent non-Federal. “(d) Authorization of Appropriations.—There is authorized to be appropriated to carry out this section $10,000,000. Such sums shall remain available until expended.”