Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

2.2 KiB

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 423a Construction charges on permanently unproductive lands already paid; disposition us united_states_code code_section 43 PUBLIC LANDS 12 RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT 423a 43 U.S.C. § 423a current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s423a data/legal/raw/us/code/title-43/usc43.xml 339b75ea44609f84b1640aaaab69a5f775add9d5061c7b5c3b7cfe8821ac6989 d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f 8851db97acf4416a3d9fd5f818b8418957d410ea6c797f0229bed7aa114458e5 2026-07-04 official
legal
us-code

43 U.S.C. § 423a - Construction charges on permanently unproductive lands already paid; disposition

Text

The construction charges prior to May 25, 1926, paid on permanently unproductive lands excluded from the project shall be applied as a credit on charges due or to become due on any remaining irrigable land covered by the same water-right contract or land taken in exchange as provided in section 423c of this title. If the charges so paid exceed the amount of all water-right charges due and unpaid, plus the construction charges not yet due, the balance shall be paid in cash to the holder of the water-right contract covering the land so excluded or to the irrigation district affected; which in turn shall be charged with the responsibility of making suitable adjustment with the landowners involved. Should all the irrigable lands of a water-right applicant be excluded from the project as permanently unproductive, and no exchange be made as provided in said section, the total construction charges paid before May 25, 1926, less any accrued charges on account of operation and maintenance, shall be refunded in cash, the water-right contract shall be canceled, and all liens on account of water-right charges shall be released.

(May 25, 1926, ch. 383, § 42, 44 Stat. 647.)