Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.9 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 485f Negotiation of equitable contracts by Secretary us united_states_code code_section 43 PUBLIC LANDS 12 RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT 485f 43 U.S.C. § 485f current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s485f data/legal/raw/us/code/title-43/usc43.xml 3892a09644ed67569c0952d933b65494ec1018a0861a367e69e14457f83f0ca3 d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f 2b6faafa40b7adcc957a37578416d5deedf1d0b297f8f260cbc5abd126a8ffe1 2026-07-04 official
legal
us-code

43 U.S.C. § 485f - Negotiation of equitable contracts by Secretary

Text

(a) Existing project contract unit The Secretary is authorized and directed to investigate the repayment problems of any existing project contract unit in connection with which, in his judgment, a contract under section 485b or 485c 11 See References in Text note below. of this title would not be practicable nor provide an economically sound adjustment, and to negotiate a contract which, in his judgment, both would provide fair and equitable treatment of the repayment problems involved and would be in keeping with the general purpose of this subchapter.

(b) New projects or projects under construction; public lands; development periods For any project, division of a project, development unit of a project, or supplemental works on a project, under construction on August 4, 1939, or for which appropriations had been made, and in connection with which a repayment contract had not been executed, allocations of costs may be made in accordance with the provisions of section 485h of this title and a repayment contract may be negotiated, in the discretion of the Secretary, (1) pursuant to the authority of subsection (a) of this section or (2) in accordance, as near as may be, with the provisions in section 485h(d) or 485h(e) of this title. In connection with any such project, division, or development unit, on which the majority of the lands involved are public lands of the United States, the Secretary, prior to entering into a repayment contract, may fix a development period for each irrigation block, if any, of not to exceed ten years from and including the first year in which water is delivered for the lands in said block: Provided, That in the event a development period is fixed prior to execution of a repayment contract, execution thereof shall be a condition precedent to delivery of water after the close of the development period. During any such development period water shall be delivered to the lands in the irrigation block involved only on a toll-charge basis, at a charge per annum per acre-foot to be fixed by the Secretary each year and to be collected in advance of delivery of water. Pending negotiation and execution of a repayment contract for any other such project, division, or development unit, water may be delivered for a period of not more than five years from August 4, 1939, on the same toll-charge basis. Any such toll charges collected and which the Secretary determines to be in excess of the cost of operation and maintenance during the toll-charge period shall be credited to the construction cost of the project in the manner determined by the Secretary.

(c) Report of proposed contracts to Congress; approval; amendment after approval The Secretary from time to time shall report to the Congress on any proposed contracts negotiated pursuant to the authority of subsection (a) or (b)(1) of this section, and he may execute any such contract on behalf of the United States only after approval thereof has been given by Act of Congress. Contracts, so approved, however, may be amended from time to time by mutual agreement and without further approval by Congress if such amendments are within the scope of authority granted prior to or after April 24, 1945, to the Secretary under any Act, except that amendments providing for repayment of construction charges in a period of years longer than authorized by this subchapter, as it may be amended, shall be effective only when approved by Congress.

(Aug. 4, 1939, ch. 418, § 7, 53 Stat. 1192; Apr. 24, 1945, ch. 94, § 2, 59 Stat. 76.)

Notes

Editorial Notes

References in TextSection 485c of this title, referred to in subsec. (a), was repealed by Pub. L. 85611, § 3, Aug. 8, 1958, 72 Stat. 543.

Amendments1945—Subsec. (c). Act Apr. 24, 1945, added second sentence.

Extension of Secretarys Authority To Enter Into Amendatory ContractsSecretarys authority extended through Dec. 31, 1960, see section 485b1 of this title.