Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

2.9 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 593a Construction, operation, and maintenance of Hungry Horse Dam us united_states_code code_section 43 PUBLIC LANDS 12 RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT 593a 43 U.S.C. § 593a current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s593a data/legal/raw/us/code/title-43/usc43.xml 49f7194d99f0bcb271e8c2a50bfe05f49ece4af70d33d40fd11edc3735265583 d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f 671b327f0a7a537080ad76aff9c9dc642e51476fb86250eaef7b01c6d361176c 2026-07-04 official
legal
us-code

43 U.S.C. § 593a - Construction, operation, and maintenance of Hungry Horse Dam

Text

For the purpose of irrigation and reclamation of arid lands, for controlling floods, improving navigation, regulating the flow of the South Fork of the Flathead River, for the generation of electric energy, and for other beneficial uses primarily in the State of Montana but also in downstream areas, the Secretary of the Interior is authorized and directed to proceed as soon as practicable with the construction, operation, and maintenance of the proposed Hungry Horse Dam (including facilities for generating electric energy) on the South Fork of the Flathead River, Flathead County, Montana, to such a height as may be necessary to impound not less than one million acre-feet of water. The Hungry Horse project shall be subject to the Federal reclamation laws (Act of June 17, 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto). The Secretary of the Interior is authorized to complete, as soon as the necessary additional material is available, the construction of the Hungry Horse Dam so as to provide a storage reservoir of the maximum usable and feasible capacity.

(June 5, 1944, ch. 234, §§ 1, 2, 58 Stat. 270; Pub. L. 85428, May 29, 1958, 72 Stat. 147.)

Notes

Editorial Notes

References in TextAct of June 17, 1902, referred to in text, is popularly known as the Reclamation Act, which is classified generally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 371 of this title and Tables.

Amendments1958—Pub. L. 85428 provided that the Hungry Horse project shall be subject to the Federal reclamation laws.

Statutory Notes and Related Subsidiaries

Authorization of AppropriationsAct June 5, 1944, ch. 234, § 4, 58 Stat. 271, authorized appropriation of such sums as might be necessary to carry out the purpose of this section and section 593b of this title.