Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

3.1 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 2009 Expedited procedures for issuance of permits: enforcement of rights-of-way us united_states_code code_section 43 PUBLIC LANDS 38 CRUDE OIL TRANSPORTATION SYSTEMS 2009 43 U.S.C. § 2009 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s2009 data/legal/raw/us/code/title-43/usc43.xml 34f918ba4249238996718138e71a45a8431aa4cc6e75da2842285cb22703fb98 d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f 74a59cace5fa2fdca9e84fdff91799794e131d4181eb752b01c669c7d766abae 2026-07-04 official
legal
us-code

43 U.S.C. § 2009 - Expedited procedures for issuance of permits: enforcement of rights-of-way

Text

(a) Expedited procedures for approved systems After issuance of a decision by the President approving any crude oil transportation system, all Federal officers and agencies shall expedite, to the maximum extent practicable, consistent with applicable provisions of law, all actions necessary to determine whether to issue, administer, or enforce rights-of-way across Federal lands and to issue Federal permits in connection with, or otherwise to authorize, construction and operation of such system. Any such action shall be consistent with applicable provisions of law. After taking any such action, such officer or agency shall publish notification of the taking of such action in the Federal Register.

(b) Expedited procedures for Long Beach-Midland project All decisions regarding issuance of Federal permits, rights-of-way, and leases and other Federal authorizations necessary for construction and operation of the Long Beach-Midland project shall be consistent with applicable provisions of Federal law, except that such decisions shall be made within 30 days after the date this chapter becomes effective. The President may extend the date by which such decisions, under the preceding sentence, are to be made to a date not later than 90 days after the effective date of this chapter. Notification of the making of such decisions shall be published in the Federal Register. Nothing in this section affects any decision made before November 9, 1978.

(c) Law governing rights-of-way Rights-of-way over any Federal land with respect to an approved crude oil transportation system or the Long Beach-Midland project shall be governed by the provisions of section 185 of title 30, other than subsection (w)(2) of such section.

(Pub. L. 95617, title V, § 509, Nov. 9, 1978, 92 Stat. 3162.)

Notes

Editorial Notes

References in TextThe date this chapter becomes effective and the effective date of this chapter, referred to in subsec. (b), mean the date of enactment of title V of Pub. L. 95617, which was approved Nov. 9, 1978.