Files
2026-07-06 17:28:36 -04:00

6.4 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, legislature, session, identifier, citation, classification, subjects, status, primary_sponsors, version_count, action_count, vote_count, first_action, last_action, source, source_identifier, source_url, source_hash, vintage, source_snapshot, retrieved_at, confidence, tags
type title description jurisdiction legislature session identifier citation classification subjects status primary_sponsors version_count action_count vote_count first_action last_action source source_identifier source_url source_hash vintage source_snapshot retrieved_at confidence tags
Bill Electrical corporations: investigations. (1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to adopt inspection, maintenance, repair, and replacement standards for the distribution systems of electrical corporations in order to provide high quality, safe, and reliable service. Existing law requires the PUC to conduct a review to determine whether the standards have been met and to perform the review after every major outage. us/states/ca California Legislature 20112012 AB 2584 California AB 2584 (20112012)
bill
Electrical corporations: investigations.
enacted
Bradford
7 22 6 2012-02-24 2012-09-07 openstates ocd-bill/db08a01d-0d7b-44d2-8488-a90188fdc6ea http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201120120AB2584 d448d1eb10096362f04f1f0c33d2a386c753f156c36a3b9c58ccb4ca86b5f3de 2026-07-01 https://data.openstates.org/daily/2026-07-01/public.pgdump 2026-07-06 reported
legislation
bill
us-ca

California AB 2584 (20112012) — Electrical corporations: investigations.

(1) Under existing law, the Public Utilities Commission (PUC) has regulatory authority over public utilities, including electrical corporations, as defined. Existing law requires the PUC to adopt inspection, maintenance, repair, and replacement standards for the distribution systems of electrical corporations in order to provide high quality, safe, and reliable service. Existing law requires the PUC to conduct a review to determine whether the standards have been met and to perform the review after every major outage.

Version chain

The bill's text revisions, in order — the diff chain from filing to enrollment.

  1. 02/24/12 - Introduced (filed) — source
  2. 04/23/12 - Amended Assembly (committee substitute) — source
  3. 06/19/12 - Amended Senate (committee substitute) — source
  4. 07/06/12 - Amended Senate (committee substitute) — source
  5. 09/07/12 - Chaptered (committee substitute) — source
  6. AB2584 (committee substitute) — source
  7. 08/20/12 - Enrolled (enrolled) — source

Votes

  • Consent Calendar 2nd — 360 (pass) · upper
  • Do pass, to Consent Calendar. — 170 (pass) · lower
  • Do pass as amended, but re-refer to the Committee on Appropriations Recommend Consent. — 130 (pass) · upper
  • AB 2584 BRADFORD Consent Calendar Second Day — 730 (pass) · lower
  • Do pass as amended and be re-referred to the Committee on Appropriations. — 130 (pass) · lower
  • AB 2584 BRADFORD Concurrence in Senate Amendments — 770 (pass) · lower

Sponsors

  • Bradford — primary (person)

Timeline

The legislative action history — every referral, reading, and vote.

  • 2012-02-24 Introduced. To print. introduction
  • 2012-02-26 From printer. May be heard in committee March 27.
  • 2012-02-27 Read first time. reading-1
  • 2012-03-19 Referred to Com. on U. & C. referral-committee
  • 2012-04-19 From committee: Do pass as amended and re-refer to Com. on APPR. (Ayes 13. Noes 0.) (April 16). amendment-passage, committee-passage, committee-passage-favorable
  • 2012-04-23 Read second time and amended. reading-2, reading-1, amendment-passage
  • 2012-04-24 Re-referred to Com. on APPR. referral-committee
  • 2012-05-02 From committee: Do pass. To consent calendar. (Ayes 17. Noes 0.) (May 2). committee-passage, committee-passage-favorable
  • 2012-05-03 Read second time. Ordered to consent calendar. reading-2, reading-1
  • 2012-05-10 Read third time. Passed. Ordered to the Senate. (Ayes 73. Noes 0. Page 4787.) reading-3, reading-1, passage
  • 2012-05-10 In Senate. Read first time. To Com. on RLS. for assignment. reading-1
  • 2012-05-24 Referred to Com. on E., U. & C. referral-committee
  • 2012-06-18 From committee: Do pass as amended and re-refer to Com. on APPR. with recommendation: to consent calendar. (Ayes 13. Noes 0.) (June 11). amendment-passage, committee-passage, committee-passage-favorable
  • 2012-06-19 Read second time and amended. Re-referred to Com. on APPR. reading-2, reading-1, amendment-passage, referral-committee
  • 2012-07-05 From committee: Be placed on second reading file pursuant to Senate Rule 28.8, be amended, and ordered to consent calendar. committee-passage, amendment-passage
  • 2012-07-06 Read second time and amended. Ordered to consent calendar. reading-2, reading-1, amendment-passage
  • 2012-08-09 Read third time. Passed. Ordered to the Assembly. (Ayes 36. Noes 0. Page 4443.). reading-3, reading-1, passage
  • 2012-08-09 In Assembly. Concurrence in Senate amendments pending. May be considered on or after August 11 pursuant to Assembly Rule 77.
  • 2012-08-16 Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 77. Noes 0. Page 5959.). committee-passage-favorable, amendment-passage
  • 2012-08-21 Enrolled and presented to the Governor at 3:05 p.m.
  • 2012-09-07 Approved by the Governor. executive-signature
  • 2012-09-07 Chaptered by Secretary of State - Chapter 262, Statutes of 2012.

Source

OpenStates / OpenCivicData bulk snapshot 2026-07-01; origin ocd-bill/db08a01d-0d7b-44d2-8488-a90188fdc6ea. Confidence: reported (aggregated from official California legislature records).