Files
2026-07-06 17:26:56 -04:00

9.4 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, legislature, session, identifier, citation, classification, subjects, status, primary_sponsors, version_count, action_count, vote_count, first_action, last_action, source, source_identifier, source_url, source_hash, vintage, source_snapshot, retrieved_at, confidence, tags
type title description jurisdiction legislature session identifier citation classification subjects status primary_sponsors version_count action_count vote_count first_action last_action source source_identifier source_url source_hash vintage source_snapshot retrieved_at confidence tags
Bill Public Utilities Commission Encourage Renewable Energy Generation Section 1 of the act declares that customer-sited renewable energy generation facilities (distributed generation) such as rooftop solar can make important contributions toward meeting Colorado's declared goal of reducing greenhouse gas emissions while providing a reliable, adaptable supply of electricity for homes, businesses, and the rapidly increasing numbers of electric vehicles, and that existing limits on customer-sited renewable energy generation facilities unnecessarily restrict this potential.Sections 3 and 5 remove most of the existing limitations on the size of distributed generation facilities, which currently cannot exceed 120% of a customer's historical annual usage, to qualify for renewable energy credits. Section 3 also expands an existing exemption from regulation as a public utility to include persons who sell excess power from distributed generation located anywhere on their property or on property owned or leased by others in a master meter operation, e.g., an apartment building or mobile home park. Section 4 grants master meter operators (MMOs) that sell power from distributed generation a limited exemption from the general requirement not to charge their end users any amount above what they are billed for electricity supplied by the serving electric utility. MMOs may retain refunds, rebates, rate reductions, net metering credits, and similar reductions offered by the serving utility in its net metering program. The public utilities commission (PUC) is directed to adopt rules encouraging landlords and tenants in multi-unit buildings to share in the costs and benefits of installing new distributed generation facilities.Section 5 requires a qualifying retail utility to allow, and to adopt standards for the approval of, customer-owned meter collar adapters in residential installations. The PUC retains authority to resolve any disputes concerning the standards or their application in specific cases. Section 2 defines a meter collar adapter as a device installed between the electric meter and the meter socket box that allows the customer to interconnect power from on-site sources.Section 5 also:Replaces the term "standard rebate offer" with "net metering service" where appropriate, to more accurately reflect current practice; us/states/co Colorado General Assembly 2021A SB 21-261 Colorado SB 21-261 (2021A)
bill
enacted
Alex Valdez
Judy Amabile
Kevin Priola
Stephen Fenberg
10 16 9 2021-05-04T06:00:00+00:00 2021-06-21T06:00:00+00:00 openstates ocd-bill/38ba61c6-561e-4c0b-a0f5-60b4a7087083 http://leg.colorado.gov/bills/sb21-261 dbf8df11cb1a5210684de82324ae2c82fda46e2ae5a3d66dbcf12c8c579c4575 2026-07-01 https://data.openstates.org/daily/2026-07-01/public.pgdump 2026-07-06 reported
legislation
bill
us-co

Colorado SB 21-261 (2021A) — Public Utilities Commission Encourage Renewable Energy Generation

Section 1 of the act declares that customer-sited renewable energy generation facilities (distributed generation) such as rooftop solar can make important contributions toward meeting Colorado's declared goal of reducing greenhouse gas emissions while providing a reliable, adaptable supply of electricity for homes, businesses, and the rapidly increasing numbers of electric vehicles, and that existing limits on customer-sited renewable energy generation facilities unnecessarily restrict this potential.Sections 3 and 5 remove most of the existing limitations on the size of distributed generation facilities, which currently cannot exceed 120% of a customer's historical annual usage, to qualify for renewable energy credits. Section 3 also expands an existing exemption from regulation as a public utility to include persons who sell excess power from distributed generation located anywhere on their property or on property owned or leased by others in a master meter operation, e.g., an apartment building or mobile home park. Section 4 grants master meter operators (MMOs) that sell power from distributed generation a limited exemption from the general requirement not to charge their end users any amount above what they are billed for electricity supplied by the serving electric utility. MMOs may retain refunds, rebates, rate reductions, net metering credits, and similar reductions offered by the serving utility in its net metering program. The public utilities commission (PUC) is directed to adopt rules encouraging landlords and tenants in multi-unit buildings to share in the costs and benefits of installing new distributed generation facilities.Section 5 requires a qualifying retail utility to allow, and to adopt standards for the approval of, customer-owned meter collar adapters in residential installations. The PUC retains authority to resolve any disputes concerning the standards or their application in specific cases. Section 2 defines a meter collar adapter as a device installed between the electric meter and the meter socket box that allows the customer to interconnect power from on-site sources.Section 5 also:Replaces the term "standard rebate offer" with "net metering service" where appropriate, to more accurately reflect current practice;

Version chain

The bill's text revisions, in order — the diff chain from filing to enrollment.

  1. Committee Amendment (committee substitute) — source
  2. Engrossed (05/19/2021) (committee substitute) — source
  3. Final Act (06/18/2021) (committee substitute) — source
  4. Introduced (05/04/2021) (committee substitute) — source
  5. PA1 (05/28/2021) (committee substitute) — source
  6. PA2 (06/04/2021) (committee substitute) — source
  7. Reengrossed (05/20/2021) (committee substitute) — source
  8. Rerevised (06/07/2021) (committee substitute) — source
  9. Revised (06/04/2021) (committee substitute) — source
  10. Signed Act (06/21/2021) (committee substitute) — source

Votes

  • BILL — 4122 (pass) · lower
  • CONCUR — 2311 (pass) · upper
  • AMEND — 340 (pass) · upper
  • BILL — 277 (pass) · upper
  • REPASS — 2212 (pass) · upper
  • AMD — 2339 (fail) · lower
  • AMD — 2438 (fail) · lower
  • AMD — 2537 (fail) · lower
  • AMD — 2438 (fail) · lower

Sponsors

  • Alex Valdez — primary (person)
  • Judy Amabile — primary (person)
  • Kevin Priola — primary (person)
  • Stephen Fenberg — primary (person)

Timeline

The legislative action history — every referral, reading, and vote.

  • 2021-06-21T06:00:00+00:00 Governor Signed executive-signature
  • 2021-06-18T06:00:00+00:00 Sent to the Governor executive-receipt
  • 2021-06-18T06:00:00+00:00 Signed by the Speaker of the House
  • 2021-06-18T06:00:00+00:00 Signed by the President of the Senate
  • 2021-06-08T06:00:00+00:00 Senate Considered House Amendments - Result was to Concur - Repass
  • 2021-06-07T06:00:00+00:00 House Third Reading Passed - No Amendments passage, reading-3
  • 2021-06-04T06:00:00+00:00 House Second Reading Special Order - Passed with Amendments - Committee, Floor
  • 2021-06-04T06:00:00+00:00 House Committee on Appropriations Refer Amended to House Committee of the Whole committee-passage, referral-committee
  • 2021-05-27T06:00:00+00:00 House Committee on Energy & Environment Refer Amended to Appropriations referral-committee
  • 2021-05-20T06:00:00+00:00 Introduced In House - Assigned to Energy & Environment introduction
  • 2021-05-20T06:00:00+00:00 Senate Third Reading Passed with Amendments - Floor passage, reading-3
  • 2021-05-19T06:00:00+00:00 Senate Second Reading Passed with Amendments - Floor reading-2
  • 2021-05-18T06:00:00+00:00 Senate Second Reading Laid Over Daily - No Amendments
  • 2021-05-17T06:00:00+00:00 Senate Second Reading Laid Over Daily - No Amendments
  • 2021-05-13T06:00:00+00:00 Senate Committee on Transportation & Energy Refer Unamended to Senate Committee of the Whole committee-passage, referral-committee
  • 2021-05-04T06:00:00+00:00 Introduced In Senate - Assigned to Transportation & Energy introduction

Source

OpenStates / OpenCivicData bulk snapshot 2026-07-01; origin ocd-bill/38ba61c6-561e-4c0b-a0f5-60b4a7087083. Confidence: reported (aggregated from official Colorado legislature records).