Files
2026-07-06 17:26:56 -04:00

6.8 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, legislature, session, identifier, citation, classification, subjects, status, primary_sponsors, version_count, action_count, vote_count, first_action, last_action, source, source_identifier, source_url, source_hash, vintage, source_snapshot, retrieved_at, confidence, tags
type title description jurisdiction legislature session identifier citation classification subjects status primary_sponsors version_count action_count vote_count first_action last_action source source_identifier source_url source_hash vintage source_snapshot retrieved_at confidence tags
Bill DIRECTING ALL ELECTRIC PUBLIC UTILITIES IN DELAWARE TO PARTICIPATE IN A STUDY TO BE UNDERTAKEN BY THE DELAWARE SUSTAINABLE ENERGY UTILITY TO ASSESS AND ANALYZE THE COSTS AND BENEFITS OF THE ADOPTION OF ENERGY STORAGE SYSTEMS IN DELAWARE, AND DIRECTING THE DELAWARE SUSTAINABLE ENERGY UTILITY TO CONDUCT A PILOT PROGRAM WITH THE PARTICIPATION AND COOPERATION OF CERTAIN ELECTRIC UTILITIES TO DEVELOP AND DEPLOY PILOT PROJECTS INVOLVING BATTERY STORAGE SYSTEMS IN DELAWARE. Energy Storage Systems provide benefits to the electric grid, including grid stabilization, managing peak energy demand, and providing backup power during outages. Energy Storage Systems can provide substantial cost savings to residential, commercial, and industrial electricity customers. The construction of Energy Storage Systems will promote economic growth and job creation in Delaware. This resolution directs the Delaware Sustainable Energy Utility (DESEU) to initiate and undertake a study to assess and analyze the costs and benefits of the adoption of Energy Storage Systems, both in front of and behind the meter, by all electric public utilities in Delaware. The resolution also directs the DESEU to conduct a pilot program and provide guidance and a level of funding, to be determined by the DESEU, to support Delmarva Power & Light Company, the Delaware Municipal Electric Corporation, the Delaware Electric Cooperative, and one independent power producer to deploy at least one battery storage pilot project in Delaware to serve their Delaware service territory. The DESEU is to submit a comprehensive report detailing the findings from the battery storage pilot program and the cost-benefit study and analysis of Energy Storage Systems in Delaware on or before June 1, 2026. us/states/de Delaware General Assembly 153 SJR 3 Delaware SJR 3 (153)
joint resolution
enacted
Brian Pettyjohn
Bryant L. Richardson
Claire Snyder-Hall
David L. Wilson
David P. Sokola
Eric Morrison
John "Jack" Walsh
Josue O Ortega
Marie Pinkney
Ray Seigfried
Russell Huxtable
Spiros Mantzavinos
Stephanie L. Hansen
1 11 2 2025-03-21 2025-07-16 openstates ocd-bill/3b75d52c-056f-451a-ac32-fe8540973e89 https://legis.delaware.gov/BillDetail?LegislationId=141981 35d86bf2e66710fee0f0560a46ae4c53532586761efe93b55750b7c718db7fd8 2026-07-01 https://data.openstates.org/daily/2026-07-01/public.pgdump 2026-07-06 reported
legislation
bill
us-de

Delaware SJR 3 (153) — DIRECTING ALL ELECTRIC PUBLIC UTILITIES IN DELAWARE TO PARTICIPATE IN A STUDY TO BE UNDERTAKEN BY THE DELAWARE SUSTAINABLE ENERGY UTILITY TO ASSESS AND ANALYZE THE COSTS AND BENEFITS OF THE ADOPTION OF ENERGY STORAGE SYSTEMS IN DELAWARE, AND DIRECTING THE DELAWARE SUSTAINABLE ENERGY UTILITY TO CONDUCT A PILOT PROGRAM WITH THE PARTICIPATION AND COOPERATION OF CERTAIN ELECTRIC UTILITIES TO DEVELOP AND DEPLOY PILOT PROJECTS INVOLVING BATTERY STORAGE SYSTEMS IN DELAWARE.

Energy Storage Systems provide benefits to the electric grid, including grid stabilization, managing peak energy demand, and providing backup power during outages. Energy Storage Systems can provide substantial cost savings to residential, commercial, and industrial electricity customers. The construction of Energy Storage Systems will promote economic growth and job creation in Delaware. This resolution directs the Delaware Sustainable Energy Utility (DESEU) to initiate and undertake a study to assess and analyze the costs and benefits of the adoption of Energy Storage Systems, both in front of and behind the meter, by all electric public utilities in Delaware. The resolution also directs the DESEU to conduct a pilot program and provide guidance and a level of funding, to be determined by the DESEU, to support Delmarva Power & Light Company, the Delaware Municipal Electric Corporation, the Delaware Electric Cooperative, and one independent power producer to deploy at least one battery storage pilot project in Delaware to serve their Delaware service territory. The DESEU is to submit a comprehensive report detailing the findings from the battery storage pilot program and the cost-benefit study and analysis of Energy Storage Systems in Delaware on or before June 1, 2026.

Version chain

The bill's text revisions, in order — the diff chain from filing to enrollment.

  1. SA 2 to SJR 3 (committee substitute) — source

Votes

  • SM — 180 (pass) · upper
  • SM — 390 (pass) · lower

Sponsors

  • Brian Pettyjohn — primary (person)
  • Bryant L. Richardson — primary (person)
  • Claire Snyder-Hall — primary (person)
  • David L. Wilson — primary (person)
  • David P. Sokola — primary (person)
  • Eric Morrison — primary (person)
  • John "Jack" Walsh — primary (person)
  • Josue O Ortega — primary (person)
  • Marie Pinkney — primary (person)
  • Ray Seigfried — primary (person)
  • Russell Huxtable — primary (person)
  • Spiros Mantzavinos — primary (person)
  • Stephanie L. Hansen — primary (person)

Timeline

The legislative action history — every referral, reading, and vote.

  • 2025-03-21 Introduced and Assigned to Environment, Energy & Transportation Committee in Senate introduction, referral-committee
  • 2025-03-26 Reported Out of Committee (Environment, Energy & Transportation) in Senate with 1 Favorable, 6 On Its Merits committee-passage, committee-passage-favorable
  • 2025-03-26 Amendment SA 1 to SJR 3 - Introduced and Placed With Bill amendment-introduction
  • 2025-03-27 Amendment SA 2 to SJR 3 - Introduced and Placed With Bill amendment-introduction
  • 2025-03-27 Amendment SA 1 to SJR 3 - Stricken in Senate
  • 2025-03-27 Amendment SA 2 to SJR 3 - Passed By Senate. Votes: 18 YES 3 ABSENT amendment-passage
  • 2025-03-27 Passed By Senate. Votes: 18 YES 3 ABSENT passage
  • 2025-04-03 Assigned to Natural Resources & Energy Committee in House introduction, referral-committee
  • 2025-04-16 Reported Out of Committee (Natural Resources & Energy) in House with 8 On Its Merits committee-passage
  • 2025-07-01 Passed By House. Votes: 39 YES 1 ABSENT 1 VACANT passage
  • 2025-07-16 Signed by Governor executive-signature

Source

OpenStates / OpenCivicData bulk snapshot 2026-07-01; origin ocd-bill/3b75d52c-056f-451a-ac32-fe8540973e89. Confidence: reported (aggregated from official Delaware legislature records).