Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
9.8 KiB
type, title, description, jurisdiction, legislature, session, identifier, citation, classification, subjects, status, primary_sponsors, version_count, action_count, vote_count, first_action, last_action, source, source_identifier, source_url, source_hash, vintage, source_snapshot, retrieved_at, confidence, tags
| type | title | description | jurisdiction | legislature | session | identifier | citation | classification | subjects | status | primary_sponsors | version_count | action_count | vote_count | first_action | last_action | source | source_identifier | source_url | source_hash | vintage | source_snapshot | retrieved_at | confidence | tags | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Bill | Virginia Public Procurement Act; requirements for use of construction management contracts. | Establishes requirements for the procurement of construction using the construction management and design-build procurement methods by state and local public bodies and covered institutions of higher education, as defined in the bill, and the conditions under which such methods may be used. Public bodies must comply with procedures adopted by the Secretary of Administration for construction management or design-build projects. State public bodies and covered institutions must adopt procedures that include, among other things, a requirement that the state public body or covered institution make a written determination in advance that competitive sealed bidding is not practicable or fiscally advantageous and document the basis for the determination to use the construction management or design-build procurement method. The bill requires the Department of General Services (DGS) to evaluate the proposed procurement method of state public bodies and covered institutions and provide a recommendation regarding the procurement method within five days of receipt of the written determination. If a state public body or covered institution elects to proceed with the project using a construction management or design-build contract despite a DGS recommendation to the contrary, the state public body or covered institution must provide to DGS in writing its reasons for doing so. For local public bodies, construction management contracts may be used for projects whose cost is expected to be less than $10 million, provided that the project is a complex project and the project procurement method is approved by the local governing body. The bill also requires DGS to report to the Governor and certain General Assembly committees annually by December 1 information pertaining to (i) the agency's evaluation of projects submitted by state public bodies and covered institutions and (ii) all completed capital projects in excess of $2 million. This bill is identical to | us/states/va | Virginia General Assembly | 2017 | HB 2366 | Virginia HB 2366 (2017) |
|
|
enacted |
|
7 | 34 | 15 | 2017-01-16 | 2017-03-24 | openstates | ocd-bill/2c37b081-8b3d-4f68-9fe5-d96f59e53022 | http://lis.virginia.gov/cgi-bin/legp604.exe?171+sum+HB2366 | e8f4f27d0e9d2153a95c176a29677c24002ec9afda349da61634928cd9eb8d07 | 2026-07-01 | https://data.openstates.org/daily/2026-07-01/public.pgdump | 2026-07-06 | reported |
|
Virginia HB 2366 (2017) — Virginia Public Procurement Act; requirements for use of construction management contracts.
Establishes requirements for the procurement of construction using the construction management and design-build procurement methods by state and local public bodies and covered institutions of higher education, as defined in the bill, and the conditions under which such methods may be used. Public bodies must comply with procedures adopted by the Secretary of Administration for construction management or design-build projects. State public bodies and covered institutions must adopt procedures that include, among other things, a requirement that the state public body or covered institution make a written determination in advance that competitive sealed bidding is not practicable or fiscally advantageous and document the basis for the determination to use the construction management or design-build procurement method. The bill requires the Department of General Services (DGS) to evaluate the proposed procurement method of state public bodies and covered institutions and provide a recommendation regarding the procurement method within five days of receipt of the written determination. If a state public body or covered institution elects to proceed with the project using a construction management or design-build contract despite a DGS recommendation to the contrary, the state public body or covered institution must provide to DGS in writing its reasons for doing so. For local public bodies, construction management contracts may be used for projects whose cost is expected to be less than $10 million, provided that the project is a complex project and the project procurement method is approved by the local governing body. The bill also requires DGS to report to the Governor and certain General Assembly committees annually by December 1 information pertaining to (i) the agency's evaluation of projects submitted by state public bodies and covered institutions and (ii) all completed capital projects in excess of $2 million. This bill is identical to
Version chain
The bill's text revisions, in order — the diff chain from filing to enrollment.
- Governor: Acts of Assembly Chapter text (CHAP0699) (committee substitute) — source
- House: Bill text as passed House and Senate (HB2366ER) (committee substitute) — source
- House: Committee substitute printed 17105020D-H1 (committee substitute) — source
- House: Committee substitute printed 17105128D-H2 (committee substitute) — source
- House: Conference substitute printed 17105860D-H3 (committee substitute) — source
- House: Presented and ordered printed 17103910D (committee substitute) — source
- Senate: Committee substitute printed 17105412D-S1 (committee substitute) — source
Votes
- Senate substitute rejected by House 17105412D-S1 — 0–100 (fail) · legislature
- Subcommittee recommends reporting with substitute — 7–0 (pass) · legislature
- Reported from Appropriations with substitute — 20–0 (pass) · legislature
- Reconsideration of Senate passage agreed to by Senate — 40–0 (pass) · legislature
- Conference report agreed to by Senate — 40–0 (pass) · legislature
- Conference report agreed to by House — 95–0 (pass) · legislature
- Read third time and passed House BLOCK VOTE — 97–0 (pass) · legislature
- Reported from General Laws with substitute — 20–0 (pass) · legislature
- Subcommittee recommends reporting with substitute — 6–0 (pass) · legislature
- Reported from Finance — 12–0 (pass) · legislature
- Constitutional reading dispensed — 40–0 (pass) · legislature
- Passed Senate with substitute — 40–0 (pass) · legislature
- Reported from General Laws and Technology with substitute — 15–0 (pass) · legislature
- Passed Senate with substitute — 40–0 (pass) · legislature
- Senate insisted on substitute — 40–0 (pass) · legislature
Sponsors
- David B. Albo — primary (person)
- R. Steven Landes — cosponsor (person)
Timeline
The legislative action history — every referral, reading, and vote.
- 2017-01-16 Presented and ordered printed 17103910D
introduction - 2017-01-16 Referred to Committee on General Laws
referral-committee - 2017-01-23 Assigned GL sub: Subcommittee #2
referral-committee - 2017-01-31 Subcommittee recommends referring to Committee on Appropriations
- 2017-02-02 Referred to Committee on Appropriations
referral-committee - 2017-02-03 Assigned App. sub: General Government & Capital Outlay
referral-committee - 2017-02-04 Read first time
reading-1 - 2017-02-06 Read second time
reading-2 - 2017-02-06 General Laws Committee substitute rejected 17105020D-H1
- 2017-02-06 Appropriations Committee substitute agreed to 17105128D-H2
- 2017-02-06 Engrossed by House - committee substitute HB2366H2
- 2017-02-07 Read third time and passed House BLOCK VOTE (97-Y 0-N)
passage, reading-3 - 2017-02-08 Constitutional reading dispensed
- 2017-02-08 Referred to Committee on General Laws and Technology
referral-committee - 2017-02-13 Rereferred to Finance
referral-committee - 2017-02-21 Read third time
reading-3 - 2017-02-21 Amendments by Senator Ruff withdrawn
amendment-withdrawal - 2017-02-21 Reading of substitute waived
- 2017-02-21 Committee substitute agreed to 17105412D-S1
- 2017-02-21 Engrossed by Senate - committee substitute HB2366S1
- 2017-02-22 Placed on Calendar
- 2017-02-22 Senate substitute rejected by House 17105412D-S1 (0-Y 100-N)
- 2017-02-23 Senate requested conference committee
- 2017-02-23 House acceded to request
- 2017-02-23 Conferees appointed by House
- 2017-02-23 Conferees appointed by Senate
- 2017-02-25 Conference substitute printed 17105860D-H3
- 2017-02-25 Conference report agreed to by House (95-Y 0-N)
- 2017-03-07 Enrolled
- 2017-03-07 Signed by Speaker
- 2017-03-10 Signed by President
- 2017-03-13 Enrolled Bill communicated to Governor on 3/13/17
- 2017-03-13 Governor's Action Deadline Midnight, March 27, 2017
- 2017-03-24 Approved by Governor-Chapter 699 (effective 7/1/17)
executive-signature
Source
OpenStates / OpenCivicData bulk snapshot 2026-07-01; origin ocd-bill/2c37b081-8b3d-4f68-9fe5-d96f59e53022. Confidence: reported (aggregated from official Virginia legislature records).