Files
2026-07-06 17:28:36 -04:00

7.5 KiB
Raw Permalink Blame History

type, title, description, jurisdiction, legislature, session, identifier, citation, classification, subjects, status, primary_sponsors, version_count, action_count, vote_count, first_action, last_action, source, source_identifier, source_url, source_hash, vintage, source_snapshot, retrieved_at, confidence, tags
type title description jurisdiction legislature session identifier citation classification subjects status primary_sponsors version_count action_count vote_count first_action last_action source source_identifier source_url source_hash vintage source_snapshot retrieved_at confidence tags
Bill Electric cooperatives; net energy metering, power purchase agreements, etc. Electric cooperatives; net energy metering; power purchase agreements; local facilities usage charges. Permits any customer, besides a farm or small agricultural generating facility and any customer selling power to the electric cooperative, to interconnect with an electric cooperative and enter an agreement for local facilities usage charges. The bill provides that electric cooperatives can seek approval from the State Corporation Commission at any time for a tariff for local facilities usage charges for the use of cooperative system facilities; however, the terms of an independent agreement for local facilities usage charges shall prevail if inconsistent with the approved tariff amount.The bill permits the board of directors of an electric cooperative to approve any voluntary tariff and associated cost recovery without filing additional information with the Commission besides an informational notice. Under the bill, the Commission may administratively approve a change in rate, tariff, or term or condition of service without notice or a hearing.The bill removes the limit on raising the cap for electric cooperatives' generating capacity beyond seven percent of system peak for the purposes of net energy metering. The bill also allows electric cooperatives to permit the use of third-party partial requirements power purchase agreements for eligible customer-generators without separate approval by the Commission; however, the cooperative is required to file a revised net energy metering compliance filing.Additionally, the bill permits impacted cooperative customers to file a petition with the Commission for redress and review of the local facilities usage charges. This bill is identical to HB 266. us/states/va Virginia General Assembly 2022 SB 505 Virginia SB 505 (2022)
bill
enacted
Lynwood W. Lewis, Jr.
4 28 5 2022-01-12 2022-04-11 openstates ocd-bill/6be568d2-3895-4357-b071-6ca7e5ca6057 https://lis.virginia.gov/cgi-bin/legp604.exe?221+sum+SB505 64b3435a60ab4efb80e3e8a5995aabe4427558177c4046c6edc974aa40c398fd 2026-07-01 https://data.openstates.org/daily/2026-07-01/public.pgdump 2026-07-06 reported
legislation
bill
us-va

Virginia SB 505 (2022) — Electric cooperatives; net energy metering, power purchase agreements, etc.

Electric cooperatives; net energy metering; power purchase agreements; local facilities usage charges. Permits any customer, besides a farm or small agricultural generating facility and any customer selling power to the electric cooperative, to interconnect with an electric cooperative and enter an agreement for local facilities usage charges. The bill provides that electric cooperatives can seek approval from the State Corporation Commission at any time for a tariff for local facilities usage charges for the use of cooperative system facilities; however, the terms of an independent agreement for local facilities usage charges shall prevail if inconsistent with the approved tariff amount.The bill permits the board of directors of an electric cooperative to approve any voluntary tariff and associated cost recovery without filing additional information with the Commission besides an informational notice. Under the bill, the Commission may administratively approve a change in rate, tariff, or term or condition of service without notice or a hearing.The bill removes the limit on raising the cap for electric cooperatives' generating capacity beyond seven percent of system peak for the purposes of net energy metering. The bill also allows electric cooperatives to permit the use of third-party partial requirements power purchase agreements for eligible customer-generators without separate approval by the Commission; however, the cooperative is required to file a revised net energy metering compliance filing.Additionally, the bill permits impacted cooperative customers to file a petition with the Commission for redress and review of the local facilities usage charges. This bill is identical to HB 266.

Version chain

The bill's text revisions, in order — the diff chain from filing to enrollment.

  1. CHAP0364 (committee substitute) — source
  2. Committee substitute printed 22105614D-S1 (committee substitute) — source
  3. Prefiled and ordered printed; offered 01/12/22 22101854D (committee substitute) — source
  4. SB505ER (committee substitute) — source

Votes

  • Read third time and passed Senate (39-Y 0-N) — 390 (pass) · upper
  • Constitutional reading dispensed (40-Y 0-N) — 400 (pass) · upper
  • Reported from Commerce and Energy (22-Y 0-N) — 220 (pass) · lower
  • VOTE: Block Vote Passage (99-Y 0-N) — 980 (pass) · lower
  • Reported from Commerce and Labor with substitute (15-Y 0-N) — 150 (pass) · upper

Sponsors

  • Lynwood W. Lewis, Jr. — primary (person)

Timeline

The legislative action history — every referral, reading, and vote.

  • 2022-01-12 Prefiled and ordered printed; offered 01/12/22 22101854D introduction
  • 2022-01-12 Referred to Committee on Commerce and Labor referral-committee
  • 2022-01-19 Impact statement from SCC (SB505)
  • 2022-01-21 Assigned C&L sub: Energy referral-committee
  • 2022-01-31 Senate committee, floor amendments and substitutes offered
  • 2022-01-31 Reported from Commerce and Labor with substitute (15-Y 0-N) committee-passage
  • 2022-01-31 Committee substitute printed 22105614D-S1 substitution
  • 2022-02-02 Constitutional reading dispensed (40-Y 0-N)
  • 2022-02-03 Read second time reading-2
  • 2022-02-03 Reading of substitute waived
  • 2022-02-03 Committee substitute agreed to 22105614D-S1
  • 2022-02-03 Engrossed by Senate - committee substitute SB505S1
  • 2022-02-04 Read third time and passed Senate (39-Y 0-N) passage, reading-3
  • 2022-02-21 Placed on Calendar
  • 2022-02-21 Read first time reading-1
  • 2022-02-21 Referred to Committee on Commerce and Energy referral-committee
  • 2022-02-22 Reported from Commerce and Energy (22-Y 0-N) committee-passage
  • 2022-02-24 Read second time reading-2
  • 2022-02-25 Read third time reading-3
  • 2022-02-25 Passed House BLOCK VOTE (99-Y 0-N) passage
  • 2022-02-25 VOTE: Block Vote Passage (99-Y 0-N)
  • 2022-03-01 Enrolled
  • 2022-03-01 Signed by Speaker
  • 2022-03-02 Impact statement from SCC (SB505ER)
  • 2022-03-02 Signed by President
  • 2022-03-11 Enrolled Bill Communicated to Governor on March 11, 2022
  • 2022-03-11 Governor's Action Deadline 11:59 p.m., April 11, 2022
  • 2022-04-11 Approved by Governor-Chapter 364 (effective 7/1/22) executive-signature

Source

OpenStates / OpenCivicData bulk snapshot 2026-07-01; origin ocd-bill/6be568d2-3895-4357-b071-6ca7e5ca6057. Confidence: reported (aggregated from official Virginia legislature records).