Files
republic-os/legal/us/code/title-10/chapter-169/section-2816.md
T
Fabio 00a184bb3c Legal corpus: U.S. Code titles 1–11 from pinned OLRC XML (11,050 sections)
Raw OLRC USLM XML zips @ release 119-100 (retrieved 2026-07-04 via
Atlas depot), ingested with the standard pipeline: raw snapshot ->
per-section OKF markdown -> manifest + checksums. Title 52 untouched.
LegalText: 171 -> 11,221. Titles 12-54 await a clean OLRC retry.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 09:52:37 -04:00

3.1 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 10 U.S.C. § 2816 Consideration of energy security and energy resilience in life-cycle cost for military construction us united_states_code code_section 10 ARMED FORCES 169 MILITARY CONSTRUCTION AND MILITARY FAMILY HOUSING 2816 10 U.S.C. § 2816 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc10@119-100.zip /us/usc/t10/s2816 data/legal/raw/us/code/title-10/usc10.xml 3edbcb98f1060b67663d48ee82479c5f980ca4b0e00215ca3ffcdc54d917020d 06a2679d38355c44f4219c983fdad34009233205d6ba271593a4c1b17a739ec1 9f5e3db9451c4a767515afe057183fe5347781fa69a32812a997718a3c2e05dc 2026-07-04 official
legal
us-code

10 U.S.C. § 2816 - Consideration of energy security and energy resilience in life-cycle cost for military construction

Text

(a) In General.— (1) The Secretary concerned, when evaluating the life-cycle designed cost of a covered military construction project, shall include as a facility requirement the long-term consideration of energy security and energy resilience that would ensure that the resulting facility is capable of continuing to perform its missions, during the life of the facility, in the event of a natural or human-caused disaster, an attack, or any other unplanned event that would otherwise interfere with the ability of the facility to perform its missions.

(2) A facility requirement under paragraph (1) shall not be weighed, for cost purposes, against other facility requirements in determining the design of the facility.

(b) Inclusion in the Building Life-cycle Cost Program.— The Secretary shall include the requirements of subsection (a) in applying the latest version of the building life-cycle cost program, as developed by the National Institute of Standards and Technology, to consider on-site distributed energy assets in a building design for a covered military construction project.

(c) Covered Military Construction Project Defined.— (1) In this section, the term “covered military construction project” means a military construction project for a facility that is used to perform critical functions during a natural or human-caused disaster, an attack, or any other unplanned event.

(2) For purposes of paragraph (1), the term “facility” includes at a minimum any of the following:

(A) Operations centers.

(B) Nuclear command and control facilities.

(C) Integrated strategic and tactical warning and attack assessment facilities.

(D) Continuity of government facilities.

(E) Missile defense facilities.

(F) Air defense facilities.

(G) Hospitals.

(H) Armories and readiness centers of the National Guard.

(I) Communications facilities.

(J) Satellite and missile launch and control facilities.

(Added Pub. L. 116283, div. B, title XXVIII, § 2804(a), Jan. 1, 2021, 134 Stat. 4320.)