Files
republic-os/legal/us/code/title-10/chapter-602/section-6123.md
T
Fabio 00a184bb3c Legal corpus: U.S. Code titles 1–11 from pinned OLRC XML (11,050 sections)
Raw OLRC USLM XML zips @ release 119-100 (retrieved 2026-07-04 via
Atlas depot), ingested with the standard pipeline: raw snapshot ->
per-section OKF markdown -> manifest + checksums. Title 52 untouched.
LegalText: 171 -> 11,221. Titles 12-54 await a clean OLRC retry.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 09:52:37 -04:00

2.7 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 10 U.S.C. § 6123 Acceleration of depleted uranium manufacturing processes us united_states_code code_section 10 ARMED FORCES 602 NUCLEAR WEAPONS STOCKPILE MATTERS 6123 10 U.S.C. § 6123 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc10@119-100.zip /us/usc/t10/s6123 data/legal/raw/us/code/title-10/usc10.xml d3175717e6071dfa90a4f822e6857fe575e1e2c83e30ebde0c7c5c86676375ea 06a2679d38355c44f4219c983fdad34009233205d6ba271593a4c1b17a739ec1 f4129a85755cb402eabe53e99452d7597b36c837afdaa560220ed2bbe9499e2a 2026-07-04 official
legal
us-code

10 U.S.C. § 6123 - Acceleration of depleted uranium manufacturing processes

Text

(a) Acceleration of Manufacturing.— The Administrator shall require the nuclear security enterprise to accelerate the modernization of manufacturing processes for depleted uranium by 2030 so that the nuclear security enterprise—

(1) demonstrates bulk cold hearth melting of depleted uranium alloys to augment existing capabilities on an operational basis for war reserve components;

(2) manufactures, on a repeatable and ongoing basis, war reserve depleted uranium alloy components using net shape casting;

(3) demonstrates, if possible, a production facility to conduct routine operations for manufacturing depleted uranium alloy components outside of the current perimeter security fencing of the Y-12 National Security Complex, Oak Ridge, Tennessee; and

(4) has available high purity depleted uranium for the production of war reserve components.

(b) Annual Briefing.— Not later than March 31, 2023, and annually thereafter through 2030, the Administrator shall provide to the congressional defense committees a briefing on—

(1) progress made in carrying out subsection (a);

(2) the cost of activities conducted under such subsection during the preceding fiscal year; and

(3) the ability of the nuclear security enterprise to convert depleted uranium fluoride hexafluoride to depleted uranium tetrafluoride.

(Added Pub. L. 11960, div. C, title XXXI, § 3111(a), Dec. 18, 2025, 139 Stat. 1359.)

Notes

Editorial Notes

Prior ProvisionsProvisions similar to those in this section were contained in section 3121 of Pub. L. 117263, which was set out as a note under section 2532 of Title 50, War and National Defense, prior to repeal by Pub. L. 11960, § 3111(b)(11).