Files
republic-os/legal/us/code/title-10/chapter-607/section-6285.md
T
Fabio 00a184bb3c Legal corpus: U.S. Code titles 1–11 from pinned OLRC XML (11,050 sections)
Raw OLRC USLM XML zips @ release 119-100 (retrieved 2026-07-04 via
Atlas depot), ingested with the standard pipeline: raw snapshot ->
per-section OKF markdown -> manifest + checksums. Title 52 untouched.
LegalText: 171 -> 11,221. Titles 12-54 await a clean OLRC retry.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 09:52:37 -04:00

2.4 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 10 U.S.C. § 6285 Life-cycle cost estimates of certain atomic energy defense capital assets us united_states_code code_section 10 ARMED FORCES 607 BUDGET AND FINANCIAL MANAGEMENT MATTERS 6285 10 U.S.C. § 6285 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc10@119-100.zip /us/usc/t10/s6285 data/legal/raw/us/code/title-10/usc10.xml a6575dde7168b8b188541a1b49d7f2c1581d174a3e8f76e7492a97f9b51d3c3b 06a2679d38355c44f4219c983fdad34009233205d6ba271593a4c1b17a739ec1 5a450a2901ddabc6824312eefeae2a318a749955b321a746954661b5bc79b056 2026-07-04 official
legal
us-code

10 U.S.C. § 6285 - Life-cycle cost estimates of certain atomic energy defense capital assets

Text

(a) In General.— The Secretary of Energy shall ensure that an independent life-cycle cost estimate under Department of Energy Order 413.3B (relating to program management and project management for the acquisition of capital assets), or a successor order, of each capital asset described in subsection (b) is conducted before the asset achieves critical decision 2 in the acquisition process.

(b) Capital Assets Described.— A capital asset described in this subsection is an atomic energy defense capital asset—

(1) the total project cost of which exceeds $100,000,000; and

(2) the purpose of which is to perform a limited-life, single-purpose mission.

(c) Independent Defined.— For purposes of subsection (a), the term “independent”, with respect to a life-cycle cost estimate of a capital asset, means that the life-cycle cost estimate is prepared by an organization independent of the project sponsor, using the same detailed technical and procurement information as the sponsor, to determine if the life-cycle cost estimate of the sponsor is accurate and reasonable.

(Added Pub. L. 11960, div. C, title XXXI, § 3111(a), Dec. 18, 2025, 139 Stat. 1434.)

Notes

Editorial Notes

Prior ProvisionsProvisions similar to those in this section were contained in section 2754 of Title 50, War and National Defense, prior to repeal by Pub. L. 11960, § 3111(b)(1).