Files
republic-os/legal/us/code/title-14/chapter-11/section-1134.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

2.2 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 14 U.S.C. § 1134 Acquisition, production, deployment, and support us united_states_code code_section 14 COAST GUARD 11 ACQUISITIONS 1134 14 U.S.C. § 1134 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc14@119-100.zip /us/usc/t14/s1134 data/legal/raw/us/code/title-14/usc14.xml 1eb70cfafcdb228991c019cb72fc88561ec0139f99e1b1b8c94f5ef27b5aea77 0a287809467d795ac0e1a72d6743ea6b1d340c0f74c77c67bfeba10724006304 d2b33955641023af061ffcfb962dc8a9c6b3b1011af1808db1752d5e113f44e9 2026-07-04 official
legal
us-code

14 U.S.C. § 1134 - Acquisition, production, deployment, and support

Text

(a) In General.— The Commandant shall—

(1) ensure there is a stable and efficient production and support capability to develop an asset or capability for the Coast Guard;

(2) conduct follow-on testing to confirm and monitor performance and correct deficiencies; and

(3) conduct acceptance tests and trials prior to the delivery of each asset or system to ensure the delivered asset or system achieves full operational capability.

(b) Elements.— The Commandant shall—

(1) execute production contracts;

(2) ensure that delivered assets and capabilities meet operational cost and schedules requirements established in the acquisition program baseline;

(3) validate manpower and training requirements to meet system needs to operate, maintain, support, and instruct the assets or capabilities; and

(4) prepare an acquisition project or program transition plan to enter into programmatic sustainment, operations, and support.

(Added Pub. L. 111281, title IV, § 402(a), Oct. 15, 2010, 124 Stat. 2947, § 574; renumbered § 1134, Pub. L. 115282, title I, § 108(b), Dec. 4, 2018, 132 Stat. 4208.)

Notes

Editorial Notes

Amendments2018—Pub. L. 115282 renumbered section 574 of this title as this section.