Files
republic-os/legal/us/code/title-15/chapter-16b/section-783.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

2.7 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 15 U.S.C. § 783 Hydroelectric generating facilities; lists, transmittal to Congress; construction schedule and cost estimates for expedited construction program; prospective accomplishments from expedited completion of facilities; statement of appropriated but not obligated funds us united_states_code code_section 15 COMMERCE AND TRADE 16B FEDERAL ENERGY ADMINISTRATION 783 15 U.S.C. § 783 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc15@119-100.zip /us/usc/t15/s783 data/legal/raw/us/code/title-15/usc15.xml 7263e64482b05dbbc6edb98ca9803fa8797f3d19b9d5e235575d952c19c014e6 6982338d990ef19d6b52bff6825089bdd6d0ee1233d9382673faf533decd5059 4efa696402a2e9620ea8efa8a5cf9b98848234020ce46a7144e757e7a239eb9e 2026-07-04 official
legal
us-code

15 U.S.C. § 783 - Hydroelectric generating facilities; lists, transmittal to Congress; construction schedule and cost estimates for expedited construction program; prospective accomplishments from expedited completion of facilities; statement of appropriated but not obligated funds

Text

Within ninety days of the effective date of this chapter, the Administrator of the Federal Energy Administration, in consultation with the Secretary of the Interior and the Secretary of the Army, shall—

(1) transmit to the Congress—

(A) a list of hydroelectric generating facilities and electric power transmission facilities which have been authorized for construction by the Congress and which are not yet completed, and

(B) a list of opportunities to increase the capacity of existing hydroelectric generating facilities, and

(2) provide, for each such facility which is listed—

(A) a construction schedule and cost estimates for an expedited construction program which would make the facility available for service at the earliest practicable date, and

(B) a statement of the accomplishments which could be provided by the expedited completion of each facility and a statement of any funds which have been appropriated but not yet obligated.

(Pub. L. 93275, § 24, May 7, 1974, 88 Stat. 114.)

Notes

Statutory Notes and Related Subsidiaries

Transfer of Functions Federal Energy Administration terminated and functions vested by law in Administrator thereof transferred to Secretary of Energy (unless otherwise specifically provided) by sections 7151(a) and 7293 of Title 42, The Public Health and Welfare.