Files
republic-os/legal/us/code/title-16/chapter-12/section-825s.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

5.0 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 16 U.S.C. § 825s Sale of electric power from reservoir projects; rate schedules; preference in sale; construction of transmission lines; disposition of moneys us united_states_code code_section 16 CONSERVATION 12 FEDERAL REGULATION AND DEVELOPMENT OF POWER 825s 16 U.S.C. § 825s current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip /us/usc/t16/s825s data/legal/raw/us/code/title-16/usc16.xml b71e6ccdbbd64f5182a5293a5df1f087972bedfade07040552ce575d4d0efff5 7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503 9d15c97cba0e6be14621d60d8dff285bdf661cf6f0c12a5bfe1aa46a0b964d7d 2026-07-04 official
legal
us-code

16 U.S.C. § 825s - Sale of electric power from reservoir projects; rate schedules; preference in sale; construction of transmission lines; disposition of moneys

Text

Electric power and energy generated at reservoir projects under the control of the Department of the Army and in the opinion of the Secretary of the Army not required in the operation of such projects shall be delivered to the Secretary of Energy who shall transmit and dispose of such power and energy in such manner as to encourage the most widespread use thereof at the lowest possible rates to consumers consistent with sound business principles, the rate schedules to become effective upon confirmation and approval by the Secretary of Energy. Rate schedules shall be drawn having regard to the recovery (upon the basis of the application of such rate schedules to the capacity of the electric facilities of the projects) of the cost of producing and transmitting such electric energy, including the amortization of the capital investment allocated to power over a reasonable period of years. Preference in the sale of such power and energy shall be given to public bodies and cooperatives. The Secretary of Energy is authorized, from funds to be appropriated by the Congress, to construct or acquire, by purchase or other agreement, only such transmission lines and related facilities as may be necessary in order to make the power and energy generated at said projects available in wholesale quantities for sale on fair and reasonable terms and conditions to facilities owned by the Federal Government, public bodies, cooperatives, and privately owned companies. All moneys received from such sales shall be deposited in the Treasury of the United States as miscellaneous receipts.

(Dec. 22, 1944, ch. 665, § 5, 58 Stat. 890; July 26, 1947, ch. 343, title II, § 205(a), 61 Stat. 501; Pub. L. 9591, title III, §§ 301(b), 302(a)(1), Aug. 4, 1977, 91 Stat. 578.)

Notes

Editorial Notes

Codification Section was not enacted as part of the Federal Power Act which generally comprises this chapter.

Statutory Notes and Related Subsidiaries

Change of Name Department of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II, 61 Stat. 501. Section 205(a) of act July 26, 1947, was repealed by section 53 of act Aug. 10, 1956, ch. 1041, 70A Stat. 641. Section 1 of act Aug. 10, 1956, enacted “Title 10, Armed Forces” which in sections 3010 to 3013 continued military Department of the Army under administrative supervision of Secretary of the Army.

Transfer of Functions “Secretary of Energy” substituted in text for “Secretary of the Interior” in two places and for “Federal Power Commission” pursuant to Pub. L. 9591, §§ 301(b), 302(a)(1), which are classified to sections 7151(b) and 7152(a)(1) of Title 42, The Public Health and Welfare. Functions of Secretary of the Interior under this section transferred to Secretary of Energy by section 7152(a)(1) of Title 42. The Federal Power Commission was terminated, and its functions, personnel, property, funds, etc., were transferred to the Secretary of Energy (except for certain functions which were transferred to the Federal Energy Regulatory Commission) by sections 7151(b), 7171(a), 7172(a), 7291, and 7293 of Title 42.

Section as Unaffected by Submerged Lands Act Provisions of this section as not amended, modified or repealed by the Submerged Lands Act [43 U.S.C. 1301 et seq.], see section 1303 of Title 43, Public Lands.

Executive Documents

Transfer of Functions Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§ 1, 2, eff. May 24, 1950, 15 F.R. 3175, 64 Stat. 1265, set out as a note under section 792 of this title.