Files
republic-os/legal/us/code/title-16/chapter-3c/section-590z-1.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

8.1 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 16 U.S.C. § 590z1 Prerequisites for construction of project us united_states_code code_section 16 CONSERVATION 3C WATER CONSERVATION 590z1 16 U.S.C. § 590z1 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip /us/usc/t16/s590z1 data/legal/raw/us/code/title-16/usc16.xml 6cfce2d96fa0d3650243e5d621b9c4d73cc9f8deaf2ca08a5489063a4606b126 7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503 bb98a460aa61a599252479acbba39ed58bc40e7d913fca57e5fd103d3e6165a5 2026-07-04 official
legal
us-code

16 U.S.C. § 590z1 - Prerequisites for construction of project

Text

(a) Investigation and report to President No construction of a project may be undertaken pursuant to the authority of this subchapter unless and until the Secretary has made an investigation thereof and has submitted to the President his report and findings on—

(i) the engineering feasibility of the proposed construction;

(ii) the estimated cost of the proposed construction;

(iii) the part of the estimated cost which properly can be allocated to irrigation;

(iv) the part of the estimated cost which probably can be repaid by the water users in accordance with the requirements of section 590z2 of this title;

(v) the part of the estimated cost which can properly be allocated to municipal or miscellaneous water supplies or power and probably be returned to the United States in revenues therefrom;

(vi) the part of the estimated cost which can properly be allocated to the irrigation of Indian trust and tribal lands, and be repayable in accordance with existing law relating to Indian lands;

(vii) the part of the estimated cost which can properly be allocated to flood control as recommended by the Secretary after consultation with the Chief of Engineers, Department of the Army.

In connection with each such investigation, report, and finding, the Secretary shall consult with the Secretary of Agriculture regarding participation in the proposed project by the Department of Agriculture under the authority of sections 590z3 and 590z4 of this title; and the Secretary shall also transmit to the President a report by the Secretary of Agriculture to the President on the participation, if any, proposed by the Department of Agriculture. The project shall be deemed authorized and may be undertaken pursuant to this subchapter if (1) the Secretary finds and certifies to the President that the project has engineering feasibility and that the water users probably can repay, in accordance with the requirements of section 590z2 of this title an amount equal to or in excess of that part of the estimated cost allocated by him to irrigation to be met by expenditure of moneys appropriated pursuant to section 590z10(1) of this title; and (2) the President has approved said report and findings and has found that services, labor, materials, easements, and other property, including money, for the construction of the project, should be made available to the Department of the Interior by the Works Projects Administration or other Federal agencies, to the extent found necessary by the Secretary to make up the difference between the estimated cost of project construction and (i) the part thereof to be met by expenditure of moneys appropriated pursuant to section 590z10(1) of this title, together with (ii) such services, materials, money, easements, and other property as non-Federal agencies or parties have agreed to contribute and the Secretary has found acceptable under section 590z of this title.

(b) Construction of physical features No actual construction of the physical features of a project shall be undertaken unless and until (1) the Secretary has found that lands, or interests in lands, deemed necessary for the construction and operation of the major features of the projects have been secured, or sufficient progress made in their procurement to indicate the probability that all these lands or interests in lands can be secured, with titles and at prices satisfactory to him; and (2) the Secretary has found (i) that water rights adequate for the purposes of the project have been acquired with titles and at prices satisfactory to him, or that such water rights have been initiated and in his judgment can be perfected in conformity with State law and any applicable interstate agreements and in a manner satisfactory to him; and (ii) that such water rights can be utilized for the purposes of the project in conformity with State law and any applicable interstate agreements and in a manner satisfactory to him.

(c) Division of project Any part of a project hereunder may be designated as a division of the project by the Secretary if he, after consultation with the Secretary of Agriculture, deems this desirable for orderly and efficient construction or administration. The term “project”, as used in subsection (b) and section 590z2 of this title, shall be deemed to mean also “division of a project”, designated as provided in this subsection. Any project authorized for construction from appropriations under the head “Water Conservation and Utility Projects” in the Interior Department Appropriation Act, 1940 [ch. 119] (53 Stat. 685), hereinafter called the 1940 water conservation appropriation, may be designated by the Secretary, upon agreement with the Secretary of Agriculture, a project under this subchapter, and shall thereupon be subject to all the provisions and requirements thereof, except those of subsections (a) and (b).

(Aug. 11, 1939, ch. 717, § 3, 53 Stat. 1419; Oct. 14, 1940, ch. 861, 54 Stat. 1120; July 16, 1943, ch. 242, §§ 24, 57 Stat. 567; July 26, 1947, ch. 343, title II, § 205(a), 61 Stat. 501.)

Notes

Editorial Notes

References in TextThe head “Water Conservation Utility Projects” in the Interior Department Appropriation Act, 1940 [ch. 119] (53 Stat. 685), referred to in subsec. (c), was not classified to the Code.

Amendments1943—Subsec. (a)(vii). Act July 16, 1943, § 2, inserted “Secretary after consultation with the” after “as recommended”. Subsec. (b). Act July 16, 1943, § 3, amended subsec. (b) generally. Subsec. (c). Act July 16, 1943, § 4, added subsec. (c). 1940—Act Oct. 14, 1940, reenacted section.

Statutory Notes and Related Subsidiaries

Change of Name Department of War designated Department of the Army and title of Secretary of War changed to Secretary of the Army by section 205(a) of act July 26, 1947, ch. 343, title II, 61 Stat. 501. Section 205(a) of act July 26, 1947, was repealed by section 53 of act Aug. 10, 1956, ch. 1041, 70A Stat. 641. Section 1 of act Aug. 10, 1956, enacted “Title 10, Armed Forces” which in sections 3010 to 3013 continued military Department of the Army under administrative supervision of Secretary of the Army.

Construction With Section 7011 of Title 33Section as amended and modified by act Dec. 22, 1944, ch. 665, § 1(c), 58 Stat. 665, see section 7011(c) of Title 33, Navigation and Navigable Waters.

Transfer of Functions Functions of Federal Works Agency transferred to General Services Administration by act June 30, 1949, ch. 288, title I, § 103, 63 Stat. 380. See Historical and Revision Notes under section 303(b) of Title 40, Public Buildings, Property, and Works. Section 303(b) of Title 40 was amended generally by Pub. L. 109313, § 2(a)(1), Oct. 6, 2006, 120 Stat. 1734, and, as so amended, no longer relates to the Federal Works Agency and Commissioner of Public Buildings. See 2006 Amendment note under section 303 of Title 40.

Executive Documents

Transfer of Functions Works Projects Administration and its functions transferred to Federal Works Agency by Reorg. Plan No. 1 of 1939, §§ 301, 306, eff. July 1, 1939, 4 F.R. 2729, 53 Stat. 1426, set out in the Appendix to Title 5, Government Organization and Employees.