Files
republic-os/legal/us/code/title-16/chapter-47/section-2708.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.5 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 16 U.S.C. § 2708 Definitions us united_states_code code_section 16 CONSERVATION 47 SMALL HYDROELECTRIC POWER PROJECTS 2708 16 U.S.C. § 2708 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip /us/usc/t16/s2708 data/legal/raw/us/code/title-16/usc16.xml 70f9fcea54616cdc682301a9b16373b087ca7f8674951e315db87856d0554686 7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503 1a804ff6bb3df6e31884cd22489321b053f5ea36678c1db6061f75a811f1aead 2026-07-04 official
legal
us-code

16 U.S.C. § 2708 - Definitions

Text

(a) For purposes of this chapter, the term—

(1) “small hydroelectric power project” means any hydroelectric power project which is located at the site of any existing dam, which uses the water power potential of such dam, and which has not more than 30,000 kilowatts of installed capacity;

(2) “electric cooperative” means any cooperative association eligible to receive loans under section 904 of title 7;

(3) “industrial development agency” means any agency which is permitted to issue obligations the interest on which is excludable from gross income under section 103 of title 26;

(4) “project costs” means the cost of acquisiiton 11 So in original. Probably should be “acquisition”. or construction of all facilities and services and the cost of acquisition of all land and interests in land used in the design and construction and operation of a small hydroelectric power project;

(5) “nonprofit organization” means any organization described in section 501(c)(3) or 501(c)(4) of title 26 and exempt from tax under section 501(a) of title 26 (but only with respect to a trade or business carried on by such organization which is not an unrelated trade or business, determined by applying section 513(a) of title 26 to such organization);

(6) “existing dam” means any dam, the construction of which was completed or on 22 So in original. Probably should be “on or”. before July 22, 2005, and which does not require any construction or enlargement of impoundment structures (other than repairs or reconstruction) in connection with the installation of any small hydroelectric power project;

(7) “municipality” has the meaning provided in section 796 of this title; and

(8) “person” has the meaning provided in section 796 of this title.

(b) The requirement in subsection (a)(1) that a project be located at the site of an existing dam in order to qualify as a small hydroelectric power project, and the other provisions of this chapter which require that a project be at or in connection with an existing dam (or utilize the potential of such dam) in order to be assisted under or included within such provisions, shall not be construed to exclude—

(1) from the definition contained in such subsection (a)(1), or

(2) from any other provision of this chapter,

any project which utilizes or proposes to utilize natural water features for the generation of electricity, without the need for any dam or impoundment, in a manner which (as determined by the Commission) will achieve the purposes of this chapter and will do so without any adverse effect upon such natural water features.

(Pub. L. 95617, title IV, § 408, Nov. 9, 1978, 92 Stat. 3156; Pub. L. 96294, title IV, § 408(a), (c), June 30, 1980, 94 Stat. 718; Pub. L. 99514, § 2, Oct. 22, 1986, 100 Stat. 2095; Pub. L. 10958, title II, § 246, Aug. 8, 2005, 119 Stat. 679.)

Notes

Editorial Notes

References in TextThe Commission, referred to in subsec. (b), means the Federal Energy Regulatory Commission, see section 2602(3) of this title.

Amendments2005—Subsec. (a)(6). Pub. L. 10958 substituted “July 22, 2005” for “April 20, 1977”. 1986—Subsec. (a)(3), (5). Pub. L. 99514 substituted “Internal Revenue Code of 1986” for “Internal Revenue Code of 1954”, which for purposes of codification was translated as “title 26” thus requiring no change in text. 1980—Subsec. (a). Pub. L. 96294, § 408(a), (c)(1), designated existing provisions as subsec. (a) and, as so designated, in par. (1) substituted “30,000” for “15,000”. Subsec. (b). Pub. L. 96294, § 408(c)(2), added subsec. (b).