Files
republic-os/legal/us/code/title-30/chapter-22/section-862.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.8 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 30 U.S.C. § 862 Roof support us united_states_code code_section 30 MINERAL LANDS AND MINING 22 MINE SAFETY AND HEALTH 862 30 U.S.C. § 862 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc30@119-100.zip /us/usc/t30/s862 data/legal/raw/us/code/title-30/usc30.xml acbb9abe32fb40f756e1090eaf57ebaf73361cebdaa905d6c5c08681b1999f09 355f8eb5c6ad5372de4a8e665d9ed90202d53d2aac19ac001d43948af4a4dd2f c0470315d7b95c0070be9752a52cbcb889efdf21161ca94b04493594609cea06 2026-07-04 official
legal
us-code

30 U.S.C. § 862 - Roof support

Text

(a) Roof control plan; contents; review; availability Each operator shall undertake to carry out on a continuing basis a program to improve the roof control system of each coal mine and the means and measures to accomplish such system. The roof and ribs of all active underground roadways, travelways, and working places shall be supported or otherwise controlled adequately to protect persons from falls of the roof or ribs. A roof control plan and revisions thereof suitable to the roof conditions and mining system of each coal mine and approved by the Secretary shall be adopted and set out in printed form within sixty days after the operative date of this subchapter. The plan shall show the type of support and spacing approved by the Secretary. Such plan shall be reviewed periodically, at least every six months by the Secretary, taking into consideration any falls of roof or ribs or inadequacy of support of roof or ribs. No person shall proceed beyond the last permanent support unless adequate temporary support is provided or unless such temporary support is not required under the approved roof control plan and the absence of such support will not pose a hazard to the miners. A copy of the plan shall be furnished the Secretary or his authorized representative and shall be available to the miners and their representatives.

(b) Creation of dangers by roof falls The method of mining followed in any coal mine shall not expose the miner to unusual dangers from roof falls caused by excessive widths of rooms and entries or faulty pillar recovery methods.

(c) Location and supply of roof support material; safety devices for roof work The operator, in accordance with the approved plan, shall provide at or near each working face and at such other locations in the coal mine as the Secretary may prescribe an ample supply of suitable materials of proper size with which to secure the roof of all working places in a safe manner. Safety posts, jacks, or other approved devices shall be used to protect the workmen when roof material is being taken down, crossbars are being installed, roof bolt- holes are being drilled, roof bolts are being installed, and in such other circumstances as may be appropriate. Loose roof and overhanging or loose faces and ribs shall be taken down or supported. Except in the case of recovery work, supports knocked out shall be replaced promptly.

(d) Roof bolts When installation of roof bolts is permitted, such roof bolts shall be tested in accordance with the approved roof control plan.

(e) Recovery of roof bolts Roof bolts shall not be recovered where complete extractions of pillars are attempted, where adjacent to clay veins, or at the locations of other irregularities, whether natural or otherwise, that induce abnormal hazards. Where roof bolt recovery is permitted, it shall be conducted only in accordance with methods prescribed in the approved roof control plan, and shall be conducted by experienced miners and only where adequate temporary support is provided.

(f) Safety inspections; correction of dangerous conditions Where miners are exposed to danger from falls of roof, face, and ribs the operator shall examine and test the roof, face, and ribs before any work or machine is started, and as frequently thereafter as may be necessary to insure safety. When dangerous conditions are found, they shall be corrected immediately.

(Pub. L. 91173, title III, § 302, Dec. 30, 1969, 83 Stat. 766.)

Notes

Editorial Notes

References in TextFor the operative date of this subchapter, referred to in subsec. (a), see section 509 of Pub. L. 91173, set out as an Effective Date note under section 801 of this title.

Statutory Notes and Related Subsidiaries

Effective DateSection operative 90 days after Dec. 30, 1969, except to the extent an earlier date is specifically provided for in Pub. L. 91173, see section 509 of Pub. L. 91173, set out as a note under section 801 of this title.