Files
republic-os/legal/us/code/title-33/chapter-36/section-2321b.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

7.9 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 33 U.S.C. § 2321b Expediting hydropower at Corps of Engineers facilities us united_states_code code_section 33 NAVIGATION AND NAVIGABLE WATERS 36 WATER RESOURCES DEVELOPMENT 2321b 33 U.S.C. § 2321b current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc33@119-100.zip /us/usc/t33/s2321b data/legal/raw/us/code/title-33/usc33.xml 8721bbb653a1dfa16647db1f7ceb295eea6a4dd814cc8886563eada592cbcf5f de3d130b31eae77f8c0fc593f61b7287899297718d678d500eea123559828523 0f35ea4fb92c4d43cfc823902160cadea4a3282359212e50153bb2eb25660004 2026-07-04 official
legal
us-code

33 U.S.C. § 2321b - Expediting hydropower at Corps of Engineers facilities

Text

(a) Policy Congress declares that it is the policy of the United States that—

(1) the development of non-Federal hydroelectric power at Corps of Engineers water resources development projects, including locks and dams, shall be given priority;

(2) Corps of Engineers approval of non-Federal hydroelectric power at Corps of Engineers water resources development projects, including permitting required under section 408 of this title, shall be completed by the Corps of Engineers in a timely and consistent manner; and

(3) approval of hydropower at Corps of Engineers water resources development projects shall in no way diminish the other priorities and missions of the Corps of Engineers, including authorized project purposes and habitat and environmental protection.

(b) Implementation of policy The Secretary shall—

(1) ensure that the policy described in subsection (a) is implemented nationwide in an efficient, consistent, and coordinated manner; and

(2) assess opportunities—

(A) to increase the development of hydroelectric power at existing water resources development projects of the Corps of Engineers with hydroelectric facilities; and

(B) to develop new hydroelectric power at existing nonpowered water resources development projects of the Corps of Engineers.

(c) Report Not later than 2 years after June 10, 2014, and biennially thereafter, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that, at a minimum, shall include—

(1) a description of initiatives carried out by the Secretary to encourage the development of hydroelectric power by non-Federal entities at Corps of Engineers water resources development projects and to meet the requirements of subsection (b);

(2) a list of all new hydroelectric power activities by non-Federal entities approved at Corps of Engineers water resources development projects in that fiscal year, including the length of time the Secretary needed to approve those activities;

(3) a description of the status of each pending application from non-Federal entities for approval to develop hydroelectric power at Corps of Engineers water resources development projects;

(4) a description of any benefits or impacts to the environment, recreation, or other uses associated with Corps of Engineers water resources development projects at which non-Federal entities have developed hydroelectric power in the previous fiscal year; and

(5) the total annual amount of payments or other services provided to the Corps of Engineers, the Treasury, and any other Federal agency as a result of approved non-Federal hydropower projects at Corps of Engineers water resources development projects.

(d) Reviewing hydropower at Corps of Engineers facilities (1) Definition of eligible non-Federal interest In this subsection, the term “eligible non-Federal interest” means a non-Federal interest that owns or operates an existing non-Federal hydropower facility at a Corps of Engineers water resources development project.

(2) Evaluation (A) In general On the written request of an eligible non-Federal interest, the Secretary shall conduct an evaluation to consider operational changes at the applicable project to facilitate production of non-Federal hydropower, consistent with authorized project purposes. The Secretary shall solicit input from interested stakeholders as part of the evaluation.

(B) Deadline Not later than 180 days after the date on which the Secretary receives a written request under subparagraph (A), the Secretary shall provide to the non-Federal interest a written response to inform the non-Federal interest—

(i) that the Secretary has approved the request to conduct an evaluation; or

(ii) of any additional information necessary for the Secretary to approve the request to conduct an evaluation.

(3) Operational changes An operational change referred to in paragraph (2)(A) may include—

(A) changes to seasonal pool levels;

(B) modifying releases from the project; and

(C) other changes included in the written request submitted under that paragraph that enhance the usage of the project to facilitate production of non-Federal hydropower, consistent with authorized project purposes.

(4) Cost share The eligible non-Federal interest shall pay 100 percent of the costs associated with an evaluation under this subsection, including the costs to prepare the report under paragraph (6).

(5) Deadline The Secretary shall complete an evaluation under this subsection by the date that is not later than 1 year after the date on which the Secretary begins the evaluation.

(6) Report On completion of an evaluation under this subsection, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report on the effects of the operational changes proposed by the non-Federal interest and examined in the evaluation on the authorized purposes of the project, including a description of any negative impacts of the proposed operational changes on the authorized purposes of the project, or on any Federal project located in the same basin.

(7) Savings provision Nothing in this subsection—

(A) affects the authorized purposes of a Corps of Engineers water resources development project;

(B) affects existing authorities of the Corps of Engineers, including authorities with respect to navigation, flood damage reduction, environmental protection and restoration, water supply and conservation, and other related purposes; or

(C) authorizes the Secretary to make any operational changes to a Corps of Engineers water resources development project.

(Pub. L. 113121, title I, § 1008, June 10, 2014, 128 Stat. 1215; Pub. L. 116260, div. AA, title I, § 146, Dec. 27, 2020, 134 Stat. 2655; Pub. L. 117263, div. H, title LXXXI, § 8123, Dec. 23, 2022, 136 Stat. 3714.)

Notes

Editorial Notes

Codification Section was enacted as part of the Water Resources Reform and Development Act of 2014, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.

Amendments2022—Subsec. (b). Pub. L. 117263, § 8123(3), added subsec. (b). Former subsec. (b) redesignated (c). Subsec. (b)(1). Pub. L. 117263, § 8123(1), inserted “and to meet the requirements of subsection (b)” after “projects”. Subsecs. (c), (d). Pub. L. 117263, § 8123(2), redesignated subsecs. (b) and (c) as (c) and (d), respectively. 2020—Subsecs. (a), (b). Pub. L. 116260, § 146(1), substituted “water resources development” for “civil works” wherever appearing. Subsec. (c). Pub. L. 116260, § 146(2), added subsec. (c).

Statutory Notes and Related Subsidiaries

“Secretary” Defined Secretary means the Secretary of the Army, see section 2 of Pub. L. 113121, set out as a note under section 2201 of this title.