Files
republic-os/legal/us/code/title-42/chapter-91/section-8262j.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

3.2 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 42 U.S.C. § 8262j Energy management requirements for United States Postal Service us united_states_code code_section 42 THE PUBLIC HEALTH AND WELFARE 91 NATIONAL ENERGY CONSERVATION POLICY 8262j 42 U.S.C. § 8262j current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip /us/usc/t42/s8262j data/legal/raw/us/code/title-42/usc42.xml d1ee8074249e0f76e2572d651e1a15e0c0e7f013bf90fa117dfe6c61629f502c 644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e 5457ae49c5d7693ebf450db4117dc9a08dfff14dcf340c4172e51a1cd4d4269d 2026-07-04 official
legal
us-code

42 U.S.C. § 8262j - Energy management requirements for United States Postal Service

Text

(a) Energy management requirements for postal facilities (1) The Postmaster General shall, to the maximum extent practicable, ensure that each United States Postal Service facility meets the energy management requirements for Federal buildings and agencies specified in section 8253 of this title.

(2) The Postmaster General may exclude from the requirements of such section any facility or collection of facilities, and the associated energy consumption and gross square footage if the Postmaster General finds that compliance with the requirements of such section would be impracticable. A finding of impracticability shall be based on the energy intensiveness of activities carried out in such facility or collection of facilities, the type and amount of energy consumed, or the technical feasibility of making the desired changes. The Postmaster General shall identify and list in the report required under section 8262i of this title the facilities designated by it for such exclusion.

(b) Implementation steps In carrying 11 So in original. Probably should be followed by the word “out”. subsection (a), the Postmaster General shall—

(1) not later than 1 year after October 24, 1992, prepare or update, as appropriate, a plan (which may be submitted as part of the first report submitted under section 8262i of this title)—

(A) describing how this section will be implemented;

(B) designating personnel primarily responsible for achieving the requirements of this section; and

(C) identifying high priority projects;

(2) perform energy surveys of United States Postal Service facilities as necessary to achieve the requirements of this section;

(3) install those energy conservation measures that will attain the requirements of this section in a cost-effective manner as defined in section 8254 of this title; and

(4) ensure that the operation and maintenance procedures applied under this section are continued.

(Pub. L. 102486, title I, § 166, Oct. 24, 1992, 106 Stat. 2861.)

Notes

Editorial Notes

Codification Section was enacted as part of the Energy Policy Act of 1992, and not as part of the National Energy Conservation Policy Act which comprises this chapter.