Files
republic-os/legal/us/code/title-42/chapter-92/section-8311.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.4 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 42 U.S.C. § 8311 Coal capability of new electric powerplants; certification of compliance us united_states_code code_section 42 THE PUBLIC HEALTH AND WELFARE 92 POWERPLANT AND INDUSTRIAL FUEL USE 8311 42 U.S.C. § 8311 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip /us/usc/t42/s8311 data/legal/raw/us/code/title-42/usc42.xml cf4af2ec163ec18ee0b1f3b74bb05ea792464d21f9125493eba165765b3409c6 644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e 94930573b86797ec0932c782720f33ebbeb4bf85209e9e15b322894f0432dc39 2026-07-04 official
legal
us-code

42 U.S.C. § 8311 - Coal capability of new electric powerplants; certification of compliance

Text

(a) General prohibition Except to such extent as may be authorized under part B, no new electric powerplant may be constructed or operated as a base load powerplant without the capability to use coal or another alternate fuel as a primary energy source.

(b) Capability to use coal or alternate fuel An electric powerplant has the capability to use coal or another alternate fuel for purposes of this section if such electric powerplant—

(1) has sufficient inherent design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or another alternate fuel as its primary energy source; and

(2) is not physically, structurally, or technologically precluded from using coal or another alternate fuel as its primary energy source.

Capability to use coal or another alternate fuel shall not be interpreted to require any such powerplant to be immediately able to use coal or another alternate fuel as its primary energy source on its initial day of operation.

(c) Applicability to base load powerplants (1) This section shall apply only to base load powerplants, and shall not apply to peakload powerplants or intermediate load powerplants.

(2) For the purposes of this section, hours of electrical generation pursuant to emergency situations, as defined by the Secretary and reported to the Secretary, shall not be included in a determination of whether a powerplant is being operated as a base load powerplant.

(d) Self-certification (1) In order to meet the requirement of subsection (a), the owner or operator of any new electric powerplant to be operated as a base load powerplant proposing to use natural gas or petroleum as its primary energy source shall certify to the Secretary prior to construction, or prior to operation as a base load powerplant in the case of a new electric powerplant operated as a peakload powerplant or intermediate load powerplant, that such powerplant has capability to use coal or another alternate fuel, within the meaning of subsection (b). Such certification shall be effective to establish compliance with the requirement of subsection (a) as of the date it is filed with the Secretary. Within 15 days after receipt of a certification submitted pursuant to this paragraph, the Secretary shall publish in the Federal Register a notice reciting that the certification has been filed.

(2) The Secretary, within 60 days after the filing of a certification under paragraph (1), may require the owner or operator of such powerplant to provide such supporting documents as may be necessary to verify the certification.

(Pub. L. 95620, title II, § 201, Nov. 9, 1978, 92 Stat. 3298; Pub. L. 10042, § 1(c)(4)(A), May 21, 1987, 101 Stat. 311.)

Notes

Editorial Notes

Amendments1987—Pub. L. 10042 substituted “Coal capability of new electric powerplants; certification of compliance” for “New electric powerplants” in section catchline and amended text generally. Prior to amendment, text read as follows: “Except to such extent as may be authorized under part B— “(1) natural gas or petroleum shall not be used as a primary energy source in any new electric powerplant; and “(2) no new electric powerplant may be constructed without the capability to use coal or any other alternate fuel as a primary energy source.”