Files
republic-os/legal/us/code/title-42/chapter-92/section-8343.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

5.0 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 42 U.S.C. § 8343 Rules relating to case-by-case and category prohibitions us united_states_code code_section 42 THE PUBLIC HEALTH AND WELFARE 92 POWERPLANT AND INDUSTRIAL FUEL USE 8343 42 U.S.C. § 8343 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip /us/usc/t42/s8343 data/legal/raw/us/code/title-42/usc42.xml 38f08f5e476a900eea06478c5e2478e347d72ce1b26ecd44ac6ed2a0f2433d5f 644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e 1ea72b5ffe58081fa6e6b51fe84f66ca2b3c32ee1cc46e5fc17aca313c9b6340 2026-07-04 official
legal
us-code

42 U.S.C. § 8343 - Rules relating to case-by-case and category prohibitions

Text

(a) Case-by-case prohibitions (1) Except to the extent authorized by subsection (b), the Secretary shall prohibit any powerplant from using natural gas or petroleum under the authority granted him under section 8341(b) or (c) of this title only by means of a final order issued by him which shall be limited to the particular powerplant involved.

(2) The Secretary may issue such a final order only with respect to a powerplant which is not, at the time the proposed order is issued, covered by a final rule issued under section 11 So in original. Probably should be “subsection”. (b).

(b) Prohibitions applicable to categories of facilities (1) The Secretary may prohibit, by rule, the use of natural gas or petroleum under section 8341(b) of this title in existing electric powerplants.

(2) Each powerplant to be covered by any final rule issued under this subsection shall be specifically identified in the proposed rule published under section 8411(b) of this title.

(3) In prescribing any final rule under this subsection, the Secretary shall take into account any special circumstances or characteristics of each category of powerplants (such as the intermittent use, size, age, or geographic location of such powerplants). Any such rules shall not apply in the case of any existing electric powerplant with respect to which a comparable prohibition was issued by order.

(Pub. L. 95620, title III, § 303, Nov. 9, 1978, 92 Stat. 3306; Pub. L. 10042, § 1(c)(9), May 21, 1987, 101 Stat. 312.)

Notes

Editorial Notes

Amendments1987—Subsec. (a)(1). Pub. L. 10042, § 1(c)(9)(A), (B), struck out “or installation” after “powerplant” in two places and “or 8342” after “section 8341(b) or (c)”. Subsec. (a)(2). Pub. L. 10042, § 1(c)(9)(A), struck out “or installation” after “powerplant”. Subsec. (a)(3). Pub. L. 10042, § 1(c)(9)(C), struck out par. (3) which read as follows: “(A) Subject to subparagraph (B), the Secretary shall not issue a final order under this subsection to any powerplant if it is demonstrated that such powerplant would have been granted an exemption if such prohibition had been established by a final rule pursuant to subsection (b) rather than by order pursuant to this subsection, except that if a temporary exemption would have been granted, such a final order may be issued but may not take effect until such time as the temporary exemption would have terminated. “(B) In any case in which an order is not issued by reason of subparagraph (A) or in which the effective date of such order is delayed under subparagraph (A), the Secretary shall take such steps as may be necessary to assure the installation involved complies with the same requirements (including provisions of section 8354(a) of this title) as would have been applicable if an exemption had been granted based upon the grounds for which the order is not issued or the effective date of which is delayed.” Subsec. (b)(1). Pub. L. 10042, § 1(c)(9)(D), amended par. (1) generally. Prior to amendment, par. (1) read as follows: “The Secretary may, by rule, prohibit the use of natural gas or petroleum pursuant to section 8341(b) or 8342(a) of this title— “(A) in the case of any category of existing electric powerplants identified in such rule; and “(B) in the case of any category of existing major fuel-burning installations which have design capabilities of consuming fuel (or any mixture thereof) at a fuel heat input rate of 300 million Btus per hour or greater which are identified in such rule.” Subsec. (b)(2). Pub. L. 10042, § 1(c)(9)(A), struck out “or installation” after “powerplant”. Subsec. (b)(3). Pub. L. 10042, § 1(c)(9)(A), (E), struck out “or installations” after “powerplants” in two places in introductory provisions, and amended last sentence generally. Prior to amendment, last sentence read as follows: “Any such rules shall not apply in the case of any existing electric powerplant with respect to which a comparable prohibition was issued by order.”