Files
republic-os/legal/us/code/title-43/chapter-12/section-390g-1.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.0 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 390g1 Phase I of groundwater recharge demonstration program us united_states_code code_section 43 PUBLIC LANDS 12 RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT 390g1 43 U.S.C. § 390g1 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s390g1 data/legal/raw/us/code/title-43/usc43.xml 3ca435f12cc0434a26a307464181f5b4cceb825621166923b8817e658d2702a2 d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f 0494583f3ec3b65594577a6b16e25d0214bd0b3533c6c0c60962adc3d757e80e 2026-07-04 official
legal
us-code

43 U.S.C. § 390g1 - Phase I of groundwater recharge demonstration program

Text

(a) Development of detailed plan of demonstration projects; requisite features of plan During phase I, the Bureau, in consultation with the High Plains States and other Reclamation Act States and other appropriate departments and agencies of the United States, including the United States Geological Survey, shall develop a detailed plan of demonstration projects the purpose of which is to determine whether various recharge technologies may be applied to diverse geologic and hydrologic conditions represented in the High Plains States and other Reclamation Act States. In the preparation and development of such plan, the Bureau shall make maximum use of data, planning studies and other technical resources and assistance available from State and local entities: Provided, That contributions of such technical resources and assistance may be counted as part of the inkind services or other State contribution, but shall otherwise be provided without compensation to the State or local entity. This plan shall contain the selection of not less than a total of twelve demonstration project sites in High Plains States and not less than a total of nine demonstration project sites in other Reclamation Act States. Demonstration project sites shall be confined to areas having a declining water table, an available surface water supply, and a high probability of physical, chemical, and economic feasibility for recharge of the groundwater reservoir. The plan shall provide for demonstration of the application of recharge technology and the selection of water sources, determination of necessary physical works and the operation of water replacement systems, formulation of a monitoring program, identification of any economic, legal, intergovernmental, and environmental issues and projection of planning problems associated with such systems, and recommendation of legislative and administrative actions as may be necessary to carry out phase II.

(b) Recommendation of demonstration projects During phase I the Bureau is authorized and directed to recommend demonstration projects to be designed, constructed, and operated during phase II.

(c) Preliminary selection of projects Within six months, after the enactment of an appropriation Act to carry out phase I, the Secretary shall make a preliminary selection of projects to receive further planning and development and shall initiate such further planning and development for those selected projects.

(Pub. L. 98434, § 3, Sept. 28, 1984, 98 Stat. 1675; Pub. L. 10466, title I, § 1081(c), Dec. 21, 1995, 109 Stat. 721.)

Notes

Editorial Notes

Amendments1995—Subsec. (d). Pub. L. 10466 struck out subsec. (d) which read as follows: “Within twenty-four months after the date of enactment of an appropriation Act to carry out phase I, the Secretary shall transmit a report to Congress containing the recommendations made pursuant to subsection (b) of this section and a detailed statement of his findings and conclusions.”