Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
1.8 KiB
type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
| type | title | description | jurisdiction | corpus | kind | title_number | title_name | chapter_number | chapter_name | section | citation | status | release_point | release_date | source | source_url | source_identifier | source_file | source_hash | raw_snapshot_hash | text_hash | retrieved_at | confidence | tags | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LegalText | 43 U.S.C. § 390h–32 | Rancho California Water District project, California | us | united_states_code | code_section | 43 | PUBLIC LANDS | 12 | RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT | 390h–32 | 43 U.S.C. § 390h–32 | current | 119-100 | 2026-06-26 | official | https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip | /us/usc/t43/s390h–32 | data/legal/raw/us/code/title-43/usc43.xml | 28811cc5a77d9e58cd6f1f15b290dd78dc3a9d969ae450716814916f91ae3a08 | d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f | 98ff764ca0c46255a2c459fd9452debef124faf7d46471b1323c107a93d624de | 2026-07-04 | official |
|
43 U.S.C. § 390h–32 - Rancho California Water District project, California
Text
(a) Authorization The Secretary, in cooperation with the Rancho California Water District, California, may participate in the design, planning, and construction of permanent facilities for water recycling, demineralization, and desalination, and distribution of non-potable water supplies in Southern Riverside County, California.
(b) Cost sharing The Federal share of the cost of the project described in subsection (a) shall not exceed 25 percent of the total cost of the project or $20,000,000, whichever is less.
(c) Limitation Funds provided by the Secretary under this section shall not be used for operation or maintenance of the project described in subsection (a).
(Pub. L. 102–575, title XVI, § 1649, as added Pub. L. 111–11, title IX, § 9104(a), Mar. 30, 2009, 123 Stat. 1303.)