Files
republic-os/legal/us/code/title-43/chapter-12/section-508.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

7.7 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 508 Costs incurred in the modification of structures us united_states_code code_section 43 PUBLIC LANDS 12 RECLAMATION AND IRRIGATION OF LANDS BY FEDERAL GOVERNMENT 508 43 U.S.C. § 508 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s508 data/legal/raw/us/code/title-43/usc43.xml 2ec3fdab94452e765b6940ee0c6fdce6df3803b634a7ffc409c2d2dda9792786 d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f e8e30266705903be4f9365a98979a56a759a318c08c333ded6b118a0e5d50619 2026-07-04 official
legal
us-code

43 U.S.C. § 508 - Costs incurred in the modification of structures

Text

(a) Costs resulting from age and normal deterioration or lack of maintenance of structures Costs heretofore or hereafter incurred in the modification of structures under this subchapter, the cause of which results from age and normal deterioration of the structure or from nonperformance of reasonable and normal maintenance of the structure by the operating entity shall be considered as project costs and will be allocated to the purposes for which the structure was authorized initially to be constructed and will be reimbursable as provided by existing law.

(b) Nonreimbursable costs resulting from new hydrologic or seismic data or changes in criteria With respect to the $100,000,000 authorized to be appropriated in the Reclamation Safety of Dams Act of 1978 [43 U.S.C. 509], costs heretofore or hereafter incurred in the modification of structures under this subchapter, the cause of which results from new hydrologic or seismic data or changes in state-of-the-art criteria deemed necessary for safety purposes shall be nonreimbursable and nonreturnable under the Federal Reclamation law.

(c) Reimbursement of certain modification costs With respect to the additional amounts authorized to be appropriated by section 509 of this title, costs incurred in the modification of structures under this subchapter, the cause of which results from new hydrologic or seismic data or changes in state-of-the-art criteria deemed necessary for safety purposes, shall be reimbursed to the extent provided in this subsection.

(1) Fifteen percent of such costs shall be allocated to the authorized purposes of the structure, except that in the case of Jackson Lake Dam, Minidoka Project, Idaho-Wyoming, such costs shall be allocated in accordance with the allocation of operation and maintenance charges.

(2) Costs allocated to irrigation water service and capable of being repaid by the irrigation water users shall be reimbursed within 50 years of the year in which the work undertaken pursuant to this subchapter is substantially complete. Costs allocated to irrigation water service which are beyond the water users ability to pay shall be reimbursed in accordance with existing law.

(3) Costs allocated to recreation or fish and wildlife enhancement shall be reimbursed in accordance with the Federal Water Project Recreation Act (79 Stat. 213), as amended [16 U.S.C. 460l12 et seq.].

(4) Costs allocated to the purpose of municipal, industrial, and miscellaneous water service, commercial power, and the portion of recreation and fish and wildlife enhancement costs reimbursable under the Federal Water Project Recreation Act [16 U.S.C. 460l12 et seq.], shall be repaid within 50 years with interest. The interest rate used shall be determined by the Secretary of the Treasury, taking into consideration average market yields on outstanding marketable obligations of the United States with remaining periods to maturity comparable to the applicable reimbursement period during the month preceding the fiscal year in which the costs are incurred. To the extent that more than one interest rate is determined pursuant to the preceding sentence, the Secretary of the Treasury shall establish an interest rate at the weighted average of the rates so determined.

(d) Contracts for return of costs The Secretary is authorized to negotiate appropriate contracts with project beneficiaries providing for the return of reimbursable costs under this subchapter: Provided, however, That no contract entered into pursuant to this subchapter shall be deemed to be a new or amended contract for the purposes of section 390cc(a) of this title.

(e) Cost containment; modification status (1) During the construction of the modification, the Secretary shall consider cost containment measures recommended by a project beneficiary that has elected to consult with the Bureau of Reclamation on a modification.

(2) The Secretary shall provide to project beneficiaries on a periodic basis notice regarding the costs and status of the modification.

(Pub. L. 95578, § 4, Nov. 2, 1978, 92 Stat. 2471; Pub. L. 98404, § 1(1), (2), Aug. 28, 1984, 98 Stat. 1481; Pub. L. 106377, § 1(a)(2) [title II], Oct. 27, 2000, 114 Stat. 1441, 1441A67; Pub. L. 107117, div. B, § 503(1), Jan. 10, 2002, 115 Stat. 2308; Pub. L. 108439, §§ 1(a), 2(a), Dec. 3, 2004, 118 Stat. 2627.)

Notes

Editorial Notes

References in TextThe $100,000,000 authorized to be appropriated in the Reclamation Safety of Dams Act of 1978, referred to in subsec. (b), probably refers to the authorization originally contained in section 509 of this title. See 1984 Amendment note set out under section 509 of this title. The Federal Reclamation law, referred to in subsec. (b), probably means act June 17, 1902, ch. 1093, 32 Stat. 388, and Acts amendatory thereof and supplementary thereto. See section 506 of this title. Act June 17, 1902, popularly known as the Reclamation Act, is classified generally to this chapter. For complete classification of act June 17, 1902, to the Code, see Short Title note set out under section 371 of this title and Tables. The Federal Water Project Recreation Act, referred to in subsec. (c)(3), (4), is Pub. L. 8972, July 9, 1965, 79 Stat. 213, which is classified principally to part C (§ 460l12 et seq.) of subchapter LXIX of chapter 1 of Title 16, Conservation. For complete classification of this Act to the Code, see Short Title note set out under section 460l12 of Title 16 and Tables.

Amendments2004—Subsec. (c). Pub. L. 108439, § 1(a), inserted “Reimbursement of certain modification costs” as heading and substituted “With respect to the additional amounts authorized to be appropriated by section 509 of this title” for “With respect to the additional $650,000,000 authorized to be appropriated in The Reclamation Safety of Dams Act Amendments of 1984, and the additional $95,000,000 further authorized to be appropriated by amendments to that Act in 2000, and the additional $32,000,000 further authorized to be appropriated by amendments to the Act in 2001” in introductory provisions. Subsec. (e). Pub. L. 108439, § 2(a), added subsec. (e). 2002—Subsec. (c). Pub. L. 107117 inserted “and the additional $32,000,000 further authorized to be appropriated by amendments to the Act in 2001,” after “2000,” in introductory provisions. 2000—Subsec. (c). Pub. L. 106377 inserted “and the additional $95,000,000 further authorized to be appropriated by amendments to that Act in 2000,” after “1984,” in introductory provisions. 1984—Subsec. (b). Pub. L. 98404, § 1(1), substituted “With respect to the $100,000,000 authorized to be appropriated in the Reclamation Safety of Dams Act of 1978, costs” for “Costs”. Subsecs. (c), (d). Pub. L. 98404, § 1(2), added subsecs. (c) and (d).