Files
republic-os/legal/us/code/title-43/chapter-12a/section-618n.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

1.8 KiB

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 43 U.S.C. § 618n Wages of employees us united_states_code code_section 43 PUBLIC LANDS 12A BOULDER CANYON PROJECT 618n 43 U.S.C. § 618n current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc43@119-100.zip /us/usc/t43/s618n data/legal/raw/us/code/title-43/usc43.xml 6c593834fe69fdbf61c2143c48ff7170fc41e8c5fb51d5610513ad035f06d125 d46a16361aa9d10bbc4b27ea0561882d240801c965a2700a4b7cf5f02f552a5f ea917467b551f1a05cb58d46f6417778917058fa127aed8471a1e27e34d4821b 2026-07-04 official
legal
us-code

43 U.S.C. § 618n - Wages of employees

Text

All laborers and mechanics employed in the construction of any part of the project, or in the operation, maintenance, or replacement of any part of the Hoover Dam, shall be paid not less than the prevailing rate of wages or compensation for work of a similar nature prevailing in the locality of the project. In the event any dispute arises as to what are the prevailing rates, the determination thereof shall be made by the Secretary of the Interior, and his decision, subject to the concurrence of the Secretary of Labor, shall be final.

(July 19, 1940, ch. 643, § 15, 54 Stat. 779; Apr. 30, 1947, ch. 46, 61 Stat. 56.)

Notes

Statutory Notes and Related Subsidiaries

Change of Name “Hoover Dam” substituted in text for “Boulder Dam” on authority of act Apr. 30, 1947, which changed name of Boulder Dam to Hoover Dam.