Files
republic-os/legal/us/code/title-50/chapter-40/section-2341.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

2.4 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 50 U.S.C. § 2341 Elimination of plutonium production us united_states_code code_section 50 WAR AND NATIONAL DEFENSE 40 DEFENSE AGAINST WEAPONS OF MASS DESTRUCTION 2341 50 U.S.C. § 2341 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc50@119-100.zip /us/usc/t50/s2341 data/legal/raw/us/code/title-50/usc50.xml 65faa474e5b3b4903eba512aace3be579a592eda2b5782965116f56eef5c7490 708c288b5448617cab7b03b8011860274671c9aec56686858b910a06948cd7ac 977e676dc82102d3b3612ebb254e0d27d974ef14cca9aeb2b8f84e2cb8c0ccf1 2026-07-04 official
legal
us-code

50 U.S.C. § 2341 - Elimination of plutonium production

Text

(a) Replacement program The Secretary of Energy, in consultation with the Secretary of Defense, shall develop a cooperative program with the Government of Russia to eliminate the production of weapons grade plutonium by modifying or replacing the reactor cores at Tomsk7 and Krasnoyarsk26 with reactor cores that are less suitable for the production of weapons-grade plutonium.

(b) Program requirements (1) The program shall be designed to achieve completion of the modifications or replacements of the reactor cores within three years after the modification or replacement activities under the program are begun.

(2) The plan for the program shall—

(A) specify—

(i) successive steps for the modification or replacement of the reactor cores; and

(ii) clearly defined milestones to be achieved; and

(B) include estimates of the costs of the program.

(c) Submission of program plan to Congress Not later than 180 days after September 23, 1996, the Secretary of Defense shall submit to Congress—

(1) a plan for the program under subsection (a);

(2) an estimate of the United States funding that is necessary for carrying out the activities under the program for each fiscal year covered by the program; and

(3) a comparison of the benefits of the program with the benefits of other nonproliferation programs.

(Pub. L. 104201, div. A, title XIV, § 1432, Sept. 23, 1996, 110 Stat. 2726.)