type, title, description, jurisdiction, legislature, session, identifier, citation, classification, subjects, status, primary_sponsors, version_count, action_count, vote_count, first_action, last_action, source, source_identifier, source_url, source_hash, vintage, source_snapshot, retrieved_at, confidence, tags
| type | title | description | jurisdiction | legislature | session | identifier | citation | classification | subjects | status | primary_sponsors | version_count | action_count | vote_count | first_action | last_action | source | source_identifier | source_url | source_hash | vintage | source_snapshot | retrieved_at | confidence | tags | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Bill | Relating to the jurisdiction of the Energy Facility Siting Council over wind energy facilities. | Increases from 50 megawatts to 100 megawatts the minimum size that a wind energy facility needs to be before a wind energy facility is required to obtain a site certificate from the Energy Facility Siting Council. <b>Requires an applicant for a county land use permit to provide a decommissioning plan if the application is to establish a wind energy facility with an average electric generating capacity of at least 50 megawatts but less than 100 megawatts.</b> | us/states/or | Oregon Legislative Assembly | 2025R1 | HB 3874 | Oregon HB 3874 (2025R1) |
|
enacted |
|
5 | 23 | 5 | 2025-02-27T19:29:00+00:00 | 2025-06-11T23:59:21+00:00 | openstates | ocd-bill/e00ebe3f-7339-4d3f-8ec4-0cb4b225586d | https://olis.oregonlegislature.gov/liz/2025R1/Measures/Overview/HB3874 | 6fcd97ddbdd375ac0ba200992b29b5a9e9b94c19b2b55e4b8b38cb3602b9fb52 | 2026-07-01 | https://data.openstates.org/daily/2026-07-01/public.pgdump | 2026-07-06 | reported |
|
Oregon HB 3874 (2025R1) — Relating to the jurisdiction of the Energy Facility Siting Council over wind energy facilities.
Increases from 50 megawatts to 100 megawatts the minimum size that a wind energy facility needs to be before a wind energy facility is required to obtain a site certificate from the Energy Facility Siting Council. Requires an applicant for a county land use permit to provide a decommissioning plan if the application is to establish a wind energy facility with an average electric generating capacity of at least 50 megawatts but less than 100 megawatts.
Version chain
The bill's text revisions, in order — the diff chain from filing to enrollment.
- Introduced (filed) — source
- Senate Amendments to Introduced (filed) — source
- A-Engrossed (committee substitute) — source
- SEE Amendment -1 (committee substitute) — source
- Enrolled (enrolled) — source
Votes
- Third reading. Carried by Golden. Passed. — 28–1 (pass) · upper
- Heard and Reported Out — 12–0 (pass) · lower
- Third reading. Carried by Helm. Passed. — 41–14 (pass) · lower
- House concurred in Senate amendments and repassed bill. — 38–15 (pass) · lower
- Heard and Reported Out with Amendments — 5–0 (pass) · upper
Sponsors
- Ken Helm — primary (person)
- Mark Gamba — cosponsor (person)
- Mark Owens — cosponsor (person)
Timeline
The legislative action history — every referral, reading, and vote.
- 2025-02-27T19:29:00+00:00 First reading. Referred to Speaker's desk.
introduction, reading-1, referral-committee - 2025-03-05T00:19:48+00:00 Referred to Climate, Energy, and Environment.
referral-committee - 2025-03-27T15:01:00+00:00 Public Hearing held.
- 2025-04-03T15:02:00+00:00 Work Session held.
- 2025-04-07T22:34:03+00:00 Recommendation: Do pass.
committee-passage-favorable - 2025-04-08T18:18:07+00:00 Second reading.
reading-2 - 2025-04-09T19:09:30+00:00 Rules suspended. Carried over to April 10, 2025 Calendar.
- 2025-04-10T23:48:45+00:00 Rules suspended. Carried over to April 14, 2025 Calendar.
- 2025-04-14T21:54:42+00:00 Third reading. Carried by Helm. Passed.
passage, reading-3 - 2025-04-15T18:32:30+00:00 First reading. Referred to President's desk.
introduction, reading-1, referral-committee - 2025-04-15T20:12:35+00:00 Referred to Energy and Environment.
referral-committee - 2025-04-23T22:01:00+00:00 Public Hearing held.
- 2025-04-30T22:02:00+00:00 Work Session held.
- 2025-05-06T22:08:30+00:00 Recommendation: Do pass with amendments. (Printed A-Eng.)
committee-passage-favorable - 2025-05-07T19:01:49+00:00 Second reading.
reading-2 - 2025-05-08T18:40:05+00:00 Carried over to 05-12 by unanimous consent.
- 2025-05-12T19:29:07+00:00 Carried over to 05-13 by unanimous consent.
- 2025-05-13T19:18:43+00:00 Third reading. Carried by Golden. Passed.
passage, reading-3 - 2025-05-19T18:31:57+00:00 House concurred in Senate amendments and repassed bill.
- 2025-05-20T18:26:45+00:00 Speaker signed.
passage - 2025-05-20T22:02:32+00:00 President signed.
passage - 2025-05-27T23:56:40+00:00 Governor signed.
executive-signature - 2025-06-11T23:59:21+00:00 Chapter 162, (2025 Laws): Effective date January 1, 2026.