Files
republic-os/legal/us/code/title-15/chapter-15d/section-720b.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.0 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 15 U.S.C. § 720b Environmental reviews us united_states_code code_section 15 COMMERCE AND TRADE 15D ALASKA NATURAL GAS PIPELINE 720b 15 U.S.C. § 720b current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc15@119-100.zip /us/usc/t15/s720b data/legal/raw/us/code/title-15/usc15.xml 075dbfd8bcd6731bca3a09f9a96b015a7c8a73233514c018a1176768c0a76d71 6982338d990ef19d6b52bff6825089bdd6d0ee1233d9382673faf533decd5059 a7212734d1b4a8d81eea93623378c7e2d385ceeea9ceaed9f7ccd337213c7543 2026-07-04 official
legal
us-code

15 U.S.C. § 720b - Environmental reviews

Text

(a) Compliance with NEPA The issuance of a certificate of public convenience and necessity authorizing the construction and operation of any Alaska natural gas transportation project under section 720a of this title shall be treated as a major Federal action significantly affecting the quality of the human environment within the meaning of section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)).

(b) Designation of lead agency (1) In general The Commission—

(A) shall be the lead agency for purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and

(B) shall be responsible for preparing the environmental impact statement required by section 102(2)(c) 11 So in original. Probably should be section “102(2)(C)”. of that Act [42 U.S.C. 4332(2)(C)] with respect to an Alaska natural gas transportation project under section 720a of this title.

(2) Consolidation of statements In carrying out paragraph (1), the Commission shall prepare a single environmental impact statement, which shall consolidate the environmental reviews of all Federal agencies considering any aspect of the Alaska natural gas transportation project covered by the environmental impact statement.

(c) Other agencies (1) In general Each Federal agency considering an aspect of the construction and operation of an Alaska natural gas transportation project under section 720a of this title shall—

(A) cooperate with the Commission; and

(B) comply with deadlines established by the Commission in the preparation of the environmental impact statement under this section.

(2) Satisfaction of NEPA requirements The environmental impact statement prepared under this section shall be adopted by each Federal agency described in paragraph (1) in satisfaction of the responsibilities of the Federal agency under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) with respect to the Alaska natural gas transportation project covered by the environmental impact statement.

(d) Expedited process The Commission shall—

(1) not later than 1 year after the Commission determines that the application under section 720a of this title with respect to an Alaska natural gas transportation project is complete, issue a draft environmental impact statement under this section; and

(2) not later than 180 days after the date of issuance of the draft environmental impact statement, issue a final environmental impact statement, unless the Commission for good cause determines that additional time is needed.

(Pub. L. 108324, div. C, § 104, Oct. 13, 2004, 118 Stat. 1257.)

Notes

Editorial Notes

References in TextThe National Environmental Policy Act of 1969, referred to in subsec. (b)(1)(A), is Pub. L. 91190, Jan. 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§ 4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables.