Files
republic-os/legal/us/code/title-15/chapter-16c/section-792.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

13 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 15 U.S.C. § 792 Coal conversion and allocation us united_states_code code_section 15 COMMERCE AND TRADE 16C ENERGY SUPPLY AND ENVIRONMENTAL COORDINATION 792 15 U.S.C. § 792 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc15@119-100.zip /us/usc/t15/s792 data/legal/raw/us/code/title-15/usc15.xml a5f0fc35d3264b2d3e2cfaaa5751174b8c478ee4353040dfcdc92bfbe7d6a30d 6982338d990ef19d6b52bff6825089bdd6d0ee1233d9382673faf533decd5059 aabc45ab4c2fd1e0d5f61252ef913a24e4e718a93bca4132370a4af626ec1514 2026-07-04 official
legal
us-code

15 U.S.C. § 792 - Coal conversion and allocation

Text

(a) Powerplant and fuel burning installations The Federal Energy Administrator—

(1) shall, by order, prohibit any powerplant, and

(2) may, by order, prohibit any major fuel burning installation, other than a powerplant,

from burning natural gas or petroleum products as its primary energy source, if the requirements of subsection (b) are met and if (A) the Federal Energy Administrator determines such powerplant or installation on June 22, 1974, had, or thereafter acquires or is designed with, the capability and necessary plant equipment to burn coal, or (B) such powerplant or installation is required to meet a design or construction requirement under subsection (c).

(b) Prerequisites to issuance or effectiveness of orders prohibiting use of natural gas or petroleum products as primary energy source The requirements referred to in subsection (a) are as follows:

(1) An order under subsection (a) may not be issued with respect to a powerplant or installation unless the Federal Energy Administrator finds (A) that the burning of coal by such plant or installation, in lieu of petroleum products or natural gas, is practicable and consistent with the purposes of this chapter, (B) that coal and coal transportation facilities will be available during the period the order is in effect, and (C) in the case of a powerplant, that the prohibition under subsection (a) will not impair the reliability of service in the area served by such plant. Such an order shall be rescinded or modified to the extent the Federal Energy Administrator determines that any requirement described in subparagraph (A), (B), or (C) of this paragraph is no longer met; and such an order may at any time be modified if the Federal Energy Administrator determines that such order, as modified, complies with the requirements of this section.

(2) (A) Before issuing an order under subsection (a) which is applicable to a powerplant or installation for a period ending on or before June 30, 1975, the Federal Energy Administrator (i) shall give notice to the public and afford interested persons an opportunity for written presentations of data, views, and arguments, (ii) shall consult with the Administrator of the Environmental Protection Agency, and (iii) shall take into account the likelihood that the powerplant or installation will be permitted to burn coal after June 30, 1975.

(B) An order described in subparagraph (A) of this paragraph shall not become effective until the date which the Administrator of the Environmental Protection Agency certifies pursuant to section 1857c10(d)(1)(A) 11 See References in Text note below. of title 42 is the earliest date that such plant or installation will be able to comply with the air pollution requirements which will be applicable to it. Such order shall not be effective for any period certified by the Administrator of the Environmental Protection Agency pursuant to section 1857c10(d)(3)(B) 1 of title 42.

(3) (A) Before issuing an order under subsection (a) which is applicable to a powerplant or installation after June 30, 1975 (or modifying an order to which paragraph (2) applies, so as to apply such order to a powerplant or installation after such date), the Federal Energy Administrator shall give notice to the public and afford interested persons an opportunity for oral and written presentations of data, views, and arguments.

(B) An order (or modification thereof) described in subparagraph (A) of this paragraph shall not become effective until (i) the Administrator of the Environmental Protection Agency notifies the Federal Energy Administrator under section 1857c10(d)(1)(B) 1 of title 42 that such plant or installation will be able on and after July 1, 1975, to burn coal and to comply with all applicable air pollution requirements without a compliance date extension under section 1857c10(c) 1 of title 42, or (ii) if such notification is not given, the date which the Administrator of the Environmental Protection Agency certifies pursuant to section 1857c10(d)(1)(B) 1 of title 42 is the earliest date that such plant or installation will be able to comply with all applicable requirements of such 1857c10 1 of title 42. Such order (or modification) shall not be effective during any period certified by the Administrator of the Environmental Protection Agency under section 1857c10(d)(3)(B) 1 of title 42.

(c) Construction and design of powerplants or other major fuel burning installations The Federal Energy Administrator may require that any powerplant or other major fuel burning installation in the early planning process (other than a combustion gas turbine or combined cycle unit) be designed and constructed so as to be capable of using coal as its primary energy source. No powerplant or other major fuel burning installation may be required under this subsection to be so designed and constructed, if the Administrator determines that (1) in the case of a powerplant to do so is likely to result in an impairment of reliability or adequacy of service, or (2) an adequate and reliable supply of coal is not expected to be available. In considering whether to impose a design and construction requirement under this subsection, the Federal Energy Administrator shall consider the existence and effects of any contractual commitment for the construction of such facilities and the capability of the owner to recover any capital investment made as a result of any requirement imposed under this subsection.

(d) Allocation of coal The Federal Energy Administrator may, by rule or order, allocate coal (1) to any powerplant or major fuel-burning installation to which an order under subsection (a) has been issued, or (2) to any other person to the extent necessary to carry out the purposes of this chapter.

(e) Definitions For purposes of this section:

(1) The term “powerplant” means a fossil-fuel fired electric generating unit which produces electric power for purposes of sale or exchange.

(2) The term “coal” includes coal derivatives.

(f) Expiration of authority; effective dates (1) Authority to issue orders or rules under subsections (a) through (d) of this section shall expire at midnight, December 31, 1978. Such a rule or order may take effect at any time before January 1, 1985.

(2) Authority to amend, repeal, rescind, modify, or enforce such rules or orders shall expire at midnight, December 31, 1984; but the expiration of such authority shall not affect any administrative or judicial proceeding which relates to any act or omission which occurred prior to January 1, 1985.

(Pub. L. 93319, § 2, June 22, 1974, 88 Stat. 246; Pub. L. 94163, title I, § 101, Dec. 22, 1975, 89 Stat. 875; Pub. L. 9570, § 7, July 21, 1977, 91 Stat. 277.)

Notes

Editorial Notes

References in TextThis chapter, referred to in subsecs. (b)(1) and (d), was in the original “this Act”, meaning Pub. L. 93319. For complete classification of this Act to the Code, see Short Title note set out under section 791 of this title and Tables. Section 1857c10 of title 42, referred to in subsec. (b)(2)(B), (3)(B), was in the original a reference to section 119 of the Clean Air Act, and was repealed by Pub. L. 9595, § 112(b), which provided in part that references in this section to section 1857c10 shall be construed to refer to section 7413(d) of title 42 and to paragraph (5) thereof in particular. Subsequently, section 7413 of title 42 was amended generally by Pub. L. 101549, title VII, § 701, Nov. 15, 1990, 104 Stat. 2672, and, as so amended, subsec. (d) no longer relates to final compliance orders. See section 7413(a) of title 42 for provisions relating generally to compliance orders. For further details, see Compliance Orders note set out below.

Amendments1977—Subsec. (f)(1). Pub. L. 9570 substituted “shall expire at midnight, December 31, 1978” for “shall expire at midnight, June 30, 1977”. 1975—Subsec. (a). Pub. L. 94163, § 101(b), authorized the Administrator to prohibit any powerplant or other fuel burning installation from burning natural gas or petroleum products as its primary energy source if such powerplant or other installation is required to meet a design or construction requirement under subsec. (c) of this section. Subsec. (c). Pub. L. 94163, § 101(c), inserted “or other major fuel burning installation” after “powerplant” wherever appearing and inserted “in the case of a powerplant” after “if the Administrator determines that (1)”. Subsec. (f)(1). Pub. L. 94163, § 101(a)(1), substituted “June 30, 1977” for “June 30, 1975” and “January 1, 1985” for “January 1, 1979”. Subsec. (f)(2). Pub. L. 94163, § 101(a)(2), substituted “December 31, 1984” for “December 31, 1978” and “January 1, 1985” for “January 1, 1979”.

Statutory Notes and Related Subsidiaries

Transfer of Functions Federal Energy Administration terminated and functions vested by law in Administrator thereof transferred to Secretary of Energy (unless otherwise specifically provided) by sections 7151(a) and 7293 of Title 42, The Public Health and Welfare.

Compliance OrdersPub. L. 9595, title I, § 112(b), Aug. 7, 1977, 91 Stat. 709, repealed section 119 of the Clean Air Act, which was classified to section 1857c10 of Title 42, The Public Health and Welfare, and which related to the Administrators authority to deal with the energy shortage. Section 112(b) of Pub. L. 9595 provided that: “(1) Section 119 of such Act [section 1857c10 of Title 42, The Public Health and Welfare] is hereby repealed. All references to such section 119 [section 1857c10 of Title 42] or subsections thereof in section 2 of the Energy Supply and Environmental Coordination Act of 1974 (Public Law 93319) [this section] or any amendment thereto, or any subsequent enactment which supersedes such Act [Pub. L. 93319, June 22, 1974, 88 Stat. 246], shall be construed to refer to section 113(d) of the Clean Air Act [section 7413(d) of Title 42] and to paragraph (5) thereof in particular. Any certification or notification required to be given by the Administrator of the Environmental Protection Agency under section 2 of the Energy Supply and Environmental Coordination Act of 1974 [this section] or any amendment thereto, or any subsequent enactment which supersedes such Act, shall be given only when the Governor of the State in which is located the source to which the proposed order under section 113(d)(5) of the Clean Air Act [section 7413(d)(5) of Title 42] is to be issued gives his prior written concurrence. “(2) In the case of any major stationary source to which any requirement is applicable under section 113(d)(5)(B) of the Clean Air Act [section 7413(d)(5)(B) of Title 42] and for which certification is required under section 2 of the Energy Supply and Environmental Coordination Act of 1974 [this section] or any amendment thereto, or any subsequent enactment which supersedes such Act [Pub. L. 93319], the Administrator of the Environmental Protection Agency shall certify the date which he determines is the earliest date that such source will be able to comply with all such requirements. In the case of any plant or installation which the Administrator of the Environmental Protection Agency determines (after consultation with the State) will not be subject to an order under section 113(d) of the Clean Air Act [section 7413(d) of Title 42] and for which certification is required under section 2 of the Energy Supply and Environmental Coordination Act of 1974 [this section] or any amendment thereto, or any subsequent enactment which supersedes such Act [Pub. L. 93319], the Administrator of the Environmental Protection Agency shall certify the date which he determines is the earliest date that such plant or installation will be able to burn coal in compliance with all applicable emission limitations under the implementation plan. “(3) Any certification required under section 2 of the Energy Supply and Environmental Coordination Act of 1974 [this section] or any amendment thereto, or any subsequent enactment which supersedes such Act [Pub. L. 93319], or under this subsection may be provided in an order under section 113(d) of the Clean Air Act [section 7413(d) of Title 42].”