Files
republic-os/legal/us/code/title-16/chapter-12d/section-835.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

3.8 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 16 U.S.C. § 835 Project authorized; laws applicable us united_states_code code_section 16 CONSERVATION 12D COLUMBIA BASIN PROJECT 835 16 U.S.C. § 835 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip /us/usc/t16/s835 data/legal/raw/us/code/title-16/usc16.xml ca03cf40dc490df6bfd711fb6211adc8e64b28e2f7fb598d5ab487f1ccf2b489 7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503 151395ed5632207b3f751413565193ff473d01fb693c3b73f4367ed4ebcab960 2026-07-04 official
legal
us-code

16 U.S.C. § 835 - Project authorized; laws applicable

Text

In addition to the primary purposes for which the Grand Coulee Dam project (hereafter to be known as the Columbia Basin project and herein called the “project”) was authorized under the provisions of the Act of August 30, 1935 (49 Stat. 1028), the project is authorized and reauthorized as a project subject to the Reclamation Project Act of 1939; and the provisions of each of those two Acts together with the provisions of this Act shall govern the repayment of expenditures and the construction, operation, and maintenance of the works constructed as a part of the project.

(May 27, 1937, ch. 269, § 1, 50 Stat. 208; Mar. 10, 1943, ch. 14, 57 Stat. 14.)

Notes

Editorial Notes

References in TextAct of August 30, 1935 (49 Stat. 1028), referred to in text, is act Aug. 30, 1935, ch. 831, 49 Stat. 1028, which act, by section 2, authorized the construction of the Grand Coulee Dam. The Reclamation Project Act of 1939, referred to in text, is act Aug. 4, 1939, ch. 418, 53 Stat. 1187, which is classified generally to sections 375a, 387 to 389, 485 to 485h, and 485i to 485k of Title 43, Public Lands. For complete classification of this Act to the Code, see section 485k of Title 43 and Tables. Those two Acts, referred to in text, refer to the act of Aug. 30, 1935, and to the Reclamation Project Act of 1939. See notes above. This Act, referred to in text, is act May 27, 1937, ch. 269, as amended generally by act Mar. 10, 1943, ch. 14, 57 Stat. 14, known as The Columbia Basin Project Act, which enacted this section, sections 835a to 835c5 of this title, and provisions set out as a note under this section. For complete classification of this Act to the Code, see Short Title note set out under this section and Tables.

Amendments1943—Act Mar. 10, 1943, amended section generally.

Statutory Notes and Related Subsidiaries

Short TitleAct May 27, 1937, ch. 269, § 11, as added by Mar. 10, 1943, ch. 14, 57 Stat. 20, provided that: “This Act [enacting this section, sections 835a to 835c5 of this title, and provisions set out as a note below] may be cited as The Columbia Basin Project Act.”

SeparabilityAct May 27, 1937, ch. 269, § 10, as added by Mar. 10, 1943, ch. 14, 57 Stat. 20, provided that: “If any provision of this Act [see Short Title note above] or the application of such provision to any person or circumstances shall be held invalid, the remainder of the Act and the application of such provision to persons or circumstances other than those as to which it is held invalid shall not be affected thereby.”

Transfer of Functions Power marketing functions of Bureau of Reclamation, including construction, operation, and maintenance of transmission lines and attendant facilities, transferred to Secretary of Energy by section 7152(a)(1)(E), (3) of Title 42, The Public Health and Welfare, and are to be exercised by Secretary through a separate Administration within Department of Energy.