Files
republic-os/legal/us/code/title-42/chapter-92/section-8323.md
T
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

4.5 KiB
Raw Blame History

type, title, description, jurisdiction, corpus, kind, title_number, title_name, chapter_number, chapter_name, section, citation, status, release_point, release_date, source, source_url, source_identifier, source_file, source_hash, raw_snapshot_hash, text_hash, retrieved_at, confidence, tags
type title description jurisdiction corpus kind title_number title_name chapter_number chapter_name section citation status release_point release_date source source_url source_identifier source_file source_hash raw_snapshot_hash text_hash retrieved_at confidence tags
LegalText 42 U.S.C. § 8323 General requirements for exemptions us united_states_code code_section 42 THE PUBLIC HEALTH AND WELFARE 92 POWERPLANT AND INDUSTRIAL FUEL USE 8323 42 U.S.C. § 8323 current 119-100 2026-06-26 official https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc42@119-100.zip /us/usc/t42/s8323 data/legal/raw/us/code/title-42/usc42.xml a44f27dea54c8b27f55c4f5eb760886608e95fd2e51631e09b723ad4e2cb2ce2 644321055a08eb1f260a6a3e31ac157fa024756abf612a9fd6857e7e400cf24e 3a5e72836ff174d3d34884578c07f538d7ecd62366b945770052635c161b1fc5 2026-07-04 official
legal
us-code

42 U.S.C. § 8323 - General requirements for exemptions

Text

(a) Use of mixtures or fluidized bed combustion not feasible Except in the case of an exemption under section 8322(d) of this title, the Secretary may grant a permanent exemption for a powerplant under this part only—

(1) if the applicant has demonstrated that the use of a mixture of natural gas or petroleum and coal or another alternate fuel, for which an exemption under section 8322(d) of this title would be available, is not economically or technically feasible; and

(2) if the Secretary has not made a finding that the use of a method of fluidized bed combustion of coal or another alternate fuel is economically and technically feasible.

(b) State approval required for powerplant If the appropriate State regulatory authority has not approved a powerplant for which a petition has been filed, such exemption, to the extent it applies to the prohibition under section 8311 of this title against construction without the capability of using coal or another alternate fuel, shall not take effect until all approvals required by such State regulatory authority which relate to construction have been obtained.

(c) No alternative power supply in the case of a powerplant (1) Except in the case of an exemption under section 8322(c) of this title, the Secretary may not grant an exemption for a new powerplant unless he finds that the petitioner has demonstrated that there is no alternative supply of electric power which is available within a reasonable distance at a reasonable cost without impairing short-run or long-run reliability of service and which can be obtained by the petitioner, despite reasonable good faith efforts.

(2) The Secretary shall forward a copy of any such petition to the Federal Energy Regulatory Commission promptly after it is filed with the Secretary and shall consult with such Commission before making any finding on such petition under paragraph (1).

(Pub. L. 95620, title II, § 213, Nov. 9, 1978, 92 Stat. 3304; Pub. L. 10042, § 1(c)(7), May 21, 1987, 101 Stat. 312.)

Notes

Editorial Notes

Amendments1987—Subsec. (a). Pub. L. 10042, § 1(c)(7)(A), (B), in introductory provisions struck out “or (g)” after “8322(d)” and “or installation” after “powerplant”. Subsec. (b). Pub. L. 10042, § 1(c)(7)(C), amended subsec. (b) generally. Prior to amendment, subsec. (b) read as follows: “If the appropriate State regulatory authority has not approved a powerplant for which a petition has been filed, such exemption— “(1) to the extent it applies to the prohibition under section 8311(2) of this title against construction without the capability of using coal or another alternate fuel, shall not take effect until all approvals required by such State regulatory authority which relate to construction have been obtained; and “(2) to the extent it applies to the prohibition under section 8311(1) of this title against the use of natural gas or petroleum as a primary energy source, shall not take effect until all approvals required by such State regulatory authority which relate to construction or operation have been obtained.” Subsec. (c)(1). Pub. L. 10042, § 1(c)(7)(A), in introductory provisions struck out “or (g)” after “section 8322(c)”.

Statutory Notes and Related Subsidiaries

Exemption for Certain Electric Powerplants as Effective Prior to 180 Days After November 9, 1978For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of Pub. L. 95620, set out as a note under section 8301 of this title.