Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

54 lines
2.7 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
type: "LegalText"
title: "15 U.S.C. § 783"
description: "Hydroelectric generating facilities; lists, transmittal to Congress; construction schedule and cost estimates for expedited construction program; prospective accomplishments from expedited completion of facilities; statement of appropriated but not obligated funds"
jurisdiction: "us"
corpus: "united_states_code"
kind: "code_section"
title_number: 15
title_name: "COMMERCE AND TRADE"
chapter_number: "16B"
chapter_name: "FEDERAL ENERGY ADMINISTRATION"
section: "783"
citation: "15 U.S.C. § 783"
status: "current"
release_point: "119-100"
release_date: "2026-06-26"
source: "official"
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc15@119-100.zip"
source_identifier: "/us/usc/t15/s783"
source_file: "data/legal/raw/us/code/title-15/usc15.xml"
source_hash: "7263e64482b05dbbc6edb98ca9803fa8797f3d19b9d5e235575d952c19c014e6"
raw_snapshot_hash: "6982338d990ef19d6b52bff6825089bdd6d0ee1233d9382673faf533decd5059"
text_hash: "4efa696402a2e9620ea8efa8a5cf9b98848234020ce46a7144e757e7a239eb9e"
retrieved_at: "2026-07-04"
confidence: "official"
tags: ["legal", "us-code"]
---
# 15 U.S.C. § 783 - Hydroelectric generating facilities; lists, transmittal to Congress; construction schedule and cost estimates for expedited construction program; prospective accomplishments from expedited completion of facilities; statement of appropriated but not obligated funds
## Text
Within ninety days of the effective date of this chapter, the Administrator of the Federal Energy Administration, in consultation with the Secretary of the Interior and the Secretary of the Army, shall—
(1) transmit to the Congress—
(A) a list of hydroelectric generating facilities and electric power transmission facilities which have been authorized for construction by the Congress and which are not yet completed, and
(B) a list of opportunities to increase the capacity of existing hydroelectric generating facilities, and
(2) provide, for each such facility which is listed—
(A) a construction schedule and cost estimates for an expedited construction program which would make the facility available for service at the earliest practicable date, and
(B) a statement of the accomplishments which could be provided by the expedited completion of each facility and a statement of any funds which have been appropriated but not yet obligated.
(Pub. L. 93275, § 24, May 7, 1974, 88 Stat. 114.)
## Notes
Statutory Notes and Related Subsidiaries
Transfer of Functions Federal Energy Administration terminated and functions vested by law in Administrator thereof transferred to Secretary of Energy (unless otherwise specifically provided) by sections 7151(a) and 7293 of Title 42, The Public Health and Welfare.