Files
Fabio 76b8ec33a7 Legal corpus: the complete U.S. Code (59,740 sections, all 53 titles)
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code
now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 ->
59,740; repo total 105,704 records. Deterministic (byte-identical rerun,
verified on Title 42's 8,356 sections); make check green. make
legal-us-code default now covers every title.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-06 10:51:44 -04:00

36 lines
1.8 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
type: "LegalText"
title: "16 U.S.C. § 837c"
description: "Contract limitations and conditions for use of electric energy and peaking capacity of plants in other marketing areas for use within Pacific Northwest"
jurisdiction: "us"
corpus: "united_states_code"
kind: "code_section"
title_number: 16
title_name: "CONSERVATION"
chapter_number: "12F"
chapter_name: "PACIFIC NORTHWEST CONSUMER POWER PREFERENCE; RECIPROCAL PRIORITY IN OTHER REGIONS"
section: "837c"
citation: "16 U.S.C. § 837c"
status: "current"
release_point: "119-100"
release_date: "2026-06-26"
source: "official"
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc16@119-100.zip"
source_identifier: "/us/usc/t16/s837c"
source_file: "data/legal/raw/us/code/title-16/usc16.xml"
source_hash: "7d7d3adb1305cdc45282487201c9d63e7b9bb842e9eb834eb6e6e8c3a6912347"
raw_snapshot_hash: "7be8950da5a93cac7c98e4576ce00340f2aba5e8e46d29915382c203c421d503"
text_hash: "f248044d641965e00d547cb74ec6e024c559581149e170bc1df3c6f32c13f1a7"
retrieved_at: "2026-07-04"
confidence: "official"
tags: ["legal", "us-code"]
---
# 16 U.S.C. § 837c - Contract limitations and conditions for use of electric energy and peaking capacity of plants in other marketing areas for use within Pacific Northwest
## Text
Any contract of the Secretary for the sale or exchange of electric energy generated at, or peaking capacity of, Federal hydroelectric plants in marketing areas outside the Pacific Northwest for use within the Pacific Northwest shall be subject to limitations and conditions corresponding to those provided in sections 837a and 837b of this title for any contract for the sale or exchange of hydroelectric energy or peaking capacity generated within the Pacific Northwest for use outside the Pacific Northwest.
(Pub. L. 88552, § 4, Aug. 31, 1964, 78 Stat. 757.)