76b8ec33a7
Ingested titles 12–51 and 54 from OLRC USLM XML @119-100 (the whole Code now, uniform edition; Title 53 is reserved/empty). LegalText 11,221 -> 59,740; repo total 105,704 records. Deterministic (byte-identical rerun, verified on Title 42's 8,356 sections); make check green. make legal-us-code default now covers every title. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
120 lines
5.5 KiB
Markdown
120 lines
5.5 KiB
Markdown
---
|
||
type: "LegalText"
|
||
title: "33 U.S.C. § 598c"
|
||
description: "Easements for hurricane and storm damage reduction projects"
|
||
jurisdiction: "us"
|
||
corpus: "united_states_code"
|
||
kind: "code_section"
|
||
title_number: 33
|
||
title_name: "NAVIGATION AND NAVIGABLE WATERS"
|
||
chapter_number: "12"
|
||
chapter_name: "RIVER AND HARBOR IMPROVEMENTS GENERALLY"
|
||
section: "598c"
|
||
citation: "33 U.S.C. § 598c"
|
||
status: "current"
|
||
release_point: "119-100"
|
||
release_date: "2026-06-26"
|
||
source: "official"
|
||
source_url: "https://uscode.house.gov/download/releasepoints/us/pl/119/100/xml_usc33@119-100.zip"
|
||
source_identifier: "/us/usc/t33/s598c"
|
||
source_file: "data/legal/raw/us/code/title-33/usc33.xml"
|
||
source_hash: "af9a97110b83eee305c4cccd7dc742cd35e5fc129f4ff06f710f6c333e3ba707"
|
||
raw_snapshot_hash: "de3d130b31eae77f8c0fc593f61b7287899297718d678d500eea123559828523"
|
||
text_hash: "359a0d571bc777d273bee3edbe5a04014c065507fe454327aa63fc1fe2067b04"
|
||
retrieved_at: "2026-07-04"
|
||
confidence: "official"
|
||
tags: ["legal", "us-code"]
|
||
---
|
||
|
||
# 33 U.S.C. § 598c - Easements for hurricane and storm damage reduction projects
|
||
|
||
## Text
|
||
|
||
(a) In general With respect to a project for hurricane and storm damage reduction for which the Secretary is requiring a perpetual easement, the Secretary shall, upon request by the non-Federal interest for the project, certify real estate availability and proceed to construction of such project with a nonperpetual easement if—
|
||
|
||
(1) such certification and construction are in compliance with the terms of the report of the Chief of Engineers for the project and the applicable project partnership agreement; and
|
||
|
||
(2) the Secretary provides the non-Federal interest with formal notice that, in the event in which the nonperpetual easement expires and is not extended, the Secretary will be unable to—
|
||
|
||
(A) fulfill the Federal responsibility with respect to the project or carry out any required nourishment of the project under the existing project authorization;
|
||
|
||
(B) carry out repair and rehabilitation of the project under section 701n of this title; and
|
||
|
||
(C) provide any other relevant Federal assistance with respect to the project.
|
||
|
||
(b) Disclosure For any project for hurricane storm damage risk reduction, or a proposal to modify such a project, that is authorized after January 4, 2025, for which a perpetual easement is required for Federal participation in the project, the Secretary shall include in the report of the Chief of Engineers for the project a disclosure of such requirement.
|
||
|
||
(c) Management To the maximum extent practicable, the Secretary shall, at the request of the non-Federal interest for a project for hurricane storm damage risk reduction, identify and accept the minimum real estate interests necessary to carry out the project, in accordance with section 598b of this title.
|
||
|
||
(d) Hurricane and storm damage reduction project implementation (1) In general During the 2-year period beginning on January 4, 2025, notwithstanding any requirement of the Secretary for a covered project to comply with the memorandum of the Corps of Engineers entitled “Standard Estates – Perpetual Beach Nourishment and Perpetual Restrictive Dune Easement” and dated August 4, 1995, the Secretary shall carry out each covered project in a manner consistent with the previously completed initial construction and periodic nourishments of the project, including repair and restoration work on the project under section 701n(a) of this title.
|
||
|
||
(2) Covered project defined In this subsection, the term “covered project” means an authorized project for hurricane and storm damage reduction in any one of the following locations:
|
||
|
||
(A) Brevard County, Canaveral Harbor, Florida – Mid Reach.
|
||
|
||
(B) Brevard County, Canaveral Harbor, Florida – North Reach.
|
||
|
||
(C) Brevard County, Canaveral Harbor, Florida – South Reach.
|
||
|
||
(D) Broward County, Florida – Segment II.
|
||
|
||
(E) Broward County, Florida – Segment III.
|
||
|
||
(F) Dade County, Florida – Main Segment.
|
||
|
||
(G) Dade County, Florida – Sunny Isles Segment.
|
||
|
||
(H) Duval County, Florida.
|
||
|
||
(I) Fort Pierce Beach, Florida.
|
||
|
||
(J) Lee County, Florida – Captiva.
|
||
|
||
(K) Lee County, Florida – Gasparilla.
|
||
|
||
(L) Manatee County, Florida.
|
||
|
||
(M) Martin County, Florida.
|
||
|
||
(N) Nassau County, Florida.
|
||
|
||
(O) Palm Beach County, Florida – Jupiter/Carlin Segment.
|
||
|
||
(P) Palm Beach County, Florida – Delray Segment.
|
||
|
||
(Q) Palm Beach County, Florida – Mid Town.
|
||
|
||
(R) Palm Beach County, Florida – North Boca.
|
||
|
||
(S) Palm Beach County, Florida – Ocean Ridge.
|
||
|
||
(T) Panama City Beaches, Florida.
|
||
|
||
(U) Pinellas County, Florida – Long Key.
|
||
|
||
(V) Pinellas County, Florida – Sand Key Segment.
|
||
|
||
(W) Pinellas County, Florida –Treasure Island.
|
||
|
||
(X) Sarasota, Lido Key, Florida.
|
||
|
||
(Y) Sarasota County, Florida – Venice Beach.
|
||
|
||
(Z) St. Johns County, Florida – St. Augustine Beach.
|
||
|
||
(AA) St. Johns County, Florida – Vilano Segment.
|
||
|
||
(BB) St. Lucie County, Florida – Hutchinson Island.
|
||
|
||
(3) Sense of Congress It is the sense of Congress that, for the purpose of constructing and maintaining a project for hurricane and storm damage risk reduction, the minimum estate necessary for easements may not exceed the life of the project nor be less than 50 years.
|
||
|
||
(e) Savings clause Nothing in this section may be construed to affect the requirements of section 2213(d) of this title.
|
||
|
||
(Pub. L. 118–272, div. A, title I, § 1145, Jan. 4, 2025, 138 Stat. 3035.)
|
||
|
||
## Notes
|
||
|
||
Statutory Notes and Related Subsidiaries
|
||
|
||
“Secretary” Defined Secretary means the Secretary of the Army, see section 1002 of div. A of Pub. L. 118–272, set out as a note under section 2201 of this title.
|